Reconstruction Of The Municipal Stadium In Otmuchów In The Design- Build. Entitled Reconstruction Of The Municipal Stadium In Otmuchów Provided For A Flat -Rate Salary In View Of The Above Is Not Obliged To Transfer The Bill Of Quantities. During The Valuation Of Works, Each Contractor Should Be In Constant Contact With The Ordering Party And Track The Correspondence Conducted By Other Contractors Regarding The Subject Of The Contract. As Part Of The Contract, The Contractor Is Also Obliged To: 1) To Maintain Health And Safety Regulations, | 2) The Contractor In The Offer Cost Estimate Will Include The Costs Of Developing Comprehensive Technical Documentation With All Industries And Obtain A Building Permit, And After Completing The Task He Will Also Obtain Permission To Use Or Report The Completion Of Works At The Poviat Building Supervision Inspectorate In Nysa.3) The Offer Cost Estimates Will Increase The Foundations For The Future Expansion Of The Facility With A Cloakroom Floor. 4) The Contractor Will Perform Geological Tests On His Own. 3) The Contractor As The Author Of The Documentation Will Consult And Agree On Technical Solutions With The Employer On An Ongoing Basis, 4) The Contractor Will Develop A Financial And Material Schedule Of Works, 5) The Contractor As A Waste Manufacturer Of Waste Generated During The Abovementioned Works Is Responsible For Their Storage And, If Necessary, Should Regulate The Formal And Legal Status In The Field Of Waste Management (The Act On The Day On 14.12.2012, Journal Of Laws Of 2018, 6), 6) The Contractor Will Draw Up A Collage, 7) Before Joining The Construction Works, The Contractor Is To Make As -Built Geodetic Documentation (In 4 Copies) In Accordance With Art. 57 Of The Construction Law. The Inventory Should Be Carried Out Along With A Summary Of The Amount Of Basic Works (Sewage Length - Network, Connections, The Number Of Wells And Others). Geodetic Service, Possible Compensation Should Be Included In The Costs Of Performing Works. The Contractor Will Additionally Provide Archaeological And Sapper Supervision, 9), 9) The Contractor Will Enable Sports Classes On The Pitch, 10) The Contractor Will Apply All Possible Financial Resources So That In The Course Of The Implementation Of The Subject Of The Contract, He Does Not Create Difficulties For The User Of Technical Infrastructure, Facilities And Difficulties In Access To A Public Road, Taking Into Account Temporary Difficulties Resulting From Construction Works. 11) Materials From Demolition Are The Property Of The Ordering Party, I.E. Steel, Fence Elements And Heating Installations. Note !!!! The Contracting Authority Provides For Annulment Of The Procedure If The Public Funds He Intended To Spend On Financing All Or Part Of The Contract Have Not Been Granted.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.