1) The Subject Of The Order Is The Construction Of A Sanitary Building As Part Of The Task Entitled Development Of The City Market In Łask. 2) The Works Will Take Place On The Basis Of Decision No. 208/2025 Of 09.05.2025 Authorizing The Investor To Start And Conduct Construction Works, In Accordance With The Approved Construction Project, Sign Ab.6740.1.445.2024.Eg94. 3) As Part Of The Subject Of The Contract, It Is Expected To Be Carried Out In Particular The Following Construction Works: - Earthworks, - Reinforced Concrete Structural Works - Foundations, - Construction Works - Feet, Wreaths, Poles, - Substrates, Floors, - Construction And Partition Walls, - Plasters, Wall Coverings, Painting, - Roof - Covering And Isolation, Facades, - Door Joinery With A Control Panel, - Internal Sanitary Sewage System, - Internal Water Supply System, - Ventilation And Heating, - Electrical Installation - Tg Board, Internal, 4) The Scope Of The Order Also Includes The Purchase And Installation Of Necessary Equipment (Including Sanitary Fittings, Mirror, Changing Table Traffic, Emergency System And Fire Protection, Etc.) In Accordance With The Design Documentation. 5) The Contracting Authority Requires That The Project To Be Carried Out In Accordance With The Principles Of Technical Knowledge, Technical And Construction Provisions, Polish Standards And Other Applicable Regulations. 6) The Detailed Subject Of The Contract In The Scope Of Execution Of Construction Works Was Specified In The Attachments To Swz: Template Of The Contract And Project Documentation Constituting Annexes No. 6 And 7.7) The Costs Of The Offer Should Also Include Other Costs Indicated In The Contract Attached To Swz. 8) Notes: A. The Contractor Will Be Obliged To Plan And Carry Out Construction Works Covering The Investment, Taking Into Account The Least Interference In The Remaining Infrastructure Located In A Given Area. If They Are Damaged During The Works, The Contractor Will Be Obliged To Reproduce The Existing State. The Investment Will Be Implemented At The Existing And Functioning City Market, Therefore The Contractor Is Obliged To Properly Secure The Work Area, So As Not To Disturb The Current Operation Of The Marketplace And Ensure The Safety Of Users.9) A Detailed Description Of The Subject Of The Contract Is Contained In Design Documentation, Technical Specification Of The Performance And Acceptance Of Construction Works Constituting Attachments No. 7 And 8 To Swz. The Bill Of Quantities Is Only An Auxiliary Element To Calculate The Offer Price.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.