Sewage Services - Little Tower Cleaning In The Operating State And Thermal Recycling Of Sewage Sludge. The Rotting Container 1 With A Volume Of 6,000 M³ Must Be Cleaned Of The Deposits On The Container Walls By Wet Clearance. The Wet Clearance Takes Place In Filled Operating State By Industrial Divers. The Work To Be Carried Out Essentially Includes The Capture Of The Actual State Of The Deposits, The Control Of The Inner Container Walls And Control Of The Tensioning And The Screw Connections Of The Lazy Sludge Mixer Stiffer As Well As The Other Inner Piping Installation Of The Lazy Container. The Performance Includes The Vacuuming Of The Deposits From The Funnel Area Of The Rotten Container And Possibly Eliminated Existing Renunciation. With A Drainage Unit To Be Operated On Site, The Funded Mud Mixer Must Be Drained. The Drained Sewage Sludge Must Be Taken Over By The Contractor And To Dispose Of The Regulations And Principles Of The Krwge By Thermal Recycling.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.