GTR 98684403
Tenders Are Invited For Pump Replacement
ICB — International Competitive Bid
Closed
Western Asia
Tender Information
GTR Reference
98684403
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Pump Replacement
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World1,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
09-07-2025
Closed
Work Detail
Tenders are invited for Pump Replacement. The project aims to increase access to safe and reliable water services among communies in Zahle Caza, Lebanon, with a focus on improving capacies of the Bekaa Water Establishment (BWE) and enhancing water services for upstream and downstream communies of Jdita. The project includes technical and material capacity strengthening, community engagement, facilitaon of allocaon agreements, and acvaon of the regional water network. SCOPE OF WORK Water and Solar Systems Reconfiguraon Currently, water at the facility is distributed directly from the pumps to the consumers. However, the two exisng pumps have been in operaon for over 10 years, leading to a significant decline in their efficiency. As a result, more energy is required to pump and distribute water, increasing operaonal costs. To address this, we will proceed with replacing Pumps 1 and 2 at the Jdita Water Staon with new, energy-efficient units. Below are the technical specificaons of the replacement pumps: Submersible pumps duty point flow : 93 l/s , head : 100 m (please refer to the aached datasheet of the exisng pumps installed in 2015) 1 PT 100 + control cable for each pump 3 water level electrodes + control cable for each pump 1 piezometer + control cable + vented tube (40 mm PN 16 HDPE pipe) for each pump Please note that pumps depth is approximately 100 m and distance from boreholes to control room is around 20 m. In addion, the electrical cable for Pump 2 will be provided. However, any defects in the exisng risers should be reported during the pump replacement process. The manpower required to replace the cable must be included in the quotaon. Addionally, the unit cost of the risers should be specified, as it will be reflected in the Bill of Quanes (BoQ). Following is a table showcasing the BoQ for the works to be implemented: Specificaons for Pump 1: Item N° / Item / Descripon / Unit / Quanty / Unit Price (USD) / Total Price (USD) / Remarks 1 - Submersible pump Duty point: 93 l/s, Head: 100 m - pcs 1 / Refer to datasheet of pumps installed in 2015 2 - PT 100 temperature sensor with control cable - pcs 1 / 1 per pump 3 - Water level electrodes with control cable (set of 3 per pump) - set 1 / 3 electrodes per pump 4 - Piezometer with control cable and vented tube (40 mm PN 16 HDPE pipe) - pcs 1 / Includes control cable and 40mm pipe 5- Riser pipes installaon fee (to be inspected during pump replacement, if defected, the riser will be provided) - lum p sum TBD / To be quoted separately Specificaons for Pump 2: Item N° / Item Descripon / Unit / Quanty / Unit Price (USD) / Total Price (USD) / Remarks 1- Submersible pump Duty point: 93 l/s, Head: 100 m - pcs 1 / Refer to datasheet of pumps installed in 2015 2 -PT 100 temperature sensor with control cable - pcs 1 / 1 per pump 3 - Water level electrodes with control cable (set of 3 per pump) - set 1 / 3 electrodes 4- Piezometer with control cable and vented tube (40 mm PN 16 HDPE pipe) - pcs 1 / Includes control cable and 40mm pipe 5 - Manpower for electrical cable installaon - lum p sum 1 / To be quoted separately 6- Riser pipes installaon fee (to be inspected during pump replacement, if defected, the riser will be provided) - lum p sum TBD / To be quoted separately N.B: The selected Pumps set should be a well known brand same as Aturia or equivalent. All items in the BoQ shall be priced based on the supply and applicaon of the components or works. Following are the technical requirements: 1. Pumps datasheet and brands. 2. Pumps country of origin. 3. Calculaon notes for pumps selecon. 4. Basic pump curves: head pressure proporonal to the flow rate. 5. Head pressure and flow rate. 6. Pump performance. 7. Impeller size and type. 8. Efficiency curve. 9. Rotaonal speed. 10. Clutch specificaons. EXPECTED DELIVERABLES THE QUALIFICATIONS The contractor is to fulfill all requirements of the scope of work, and in case of any discrepancies and/or unexpected circumstances to nofy immediately. The contractor is to provide a fully funconal pumping facility with all properly operang pumps, chlorinaon (SCADA), electrical systems, and cameras. The buildings are to be well-repaired (waterproofing, closing holes). The PV system and generators are to be fully operaonal and in opmal condion, in addion to implemenng a proper shutdown policy. All electrical wiring is to be well-maintained and properly connected, the to-be-installed cables must be correctly and safely wired. All safety hazards are to be dealt with properly (electrical enclosures, cable covering, etc.). All leakages (diesel, water) are to be repaired and made sure to be long-term. How to apply Prepare your Bid Technical Proposal and Financial Proposal along with the required documents. Email your complete bid to: [email protected] by July 9 , 2025 The subject line must include the TOR tle: "Replacement of Pumps". Incomplete submissions or those without the correct subject line will not be considered. Required Documents: Technical Proposal Financial Proposal Relevant cerficaons or qualificaons References or case studies from previous projects Curriculum Vitae (CV) with relevant experience. ID MOF Cerficate Offer Validity: Your offer must remain valid for 60 days from the submission deadline. You may be contacted for clarificaons or further discussions during this me. Payment Terms Payment will be made via bank transfer or Telegraphic Transfer (TT) within 30 working days aer deliverables are met. Payment will be processed aer approval of the final workshop and report. Note: Without a valid MOF cerficate, tax deducons of 3.4% on goods and 8.5% on services will apply, according to the arcles number 41 and 42 of the income tax law. Tender Link : https://www.daleel-madani.org/calls-for-proposal
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2090c661-4fe7-44cc-844f-bc835241658d.htm
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.