Part 1 Of The Order - Connection Of Smólsko Waterworks Small - Round With Reconstruction, Expansion And Renovation Of The Round Suw, Whose Scope And Type Of Works Include, In Particular: • Construction Of A Water Supply Network With A Length Of About 4.0 Km From Pe100rc Ø 150 Pipes, Connecting Waterworks In Smólsk Mały And Round, From The Existing Network On The Plot No. 589 In Smólsko. Large For A Water Treatment Plant In A Round On Plot No. 1110/2 Within Korczów; • Liquidation Of Existing Water Tanks And Their Replacement With Two New, Cylindrical Tanks Made Of Galvanized Steel Sheet With A Capacity Of 150 M³ Each; • Equipment Of Water Treatment Station In Advanced Monitoring, Visualization And Remote Control Of Station Processes And Parameters Along With The Installation Of Water Meters With An Impulsive; • Installation Of A Uv Lamp And Replacement Of Chloride Equipment For In Line With Applicable Regulations; • Design A New Tank For A Launch In A Round Water Treatment Station; • Replacement Of Piping And Pumps In Existing Deep Wells For New Ones With Identical Parameters; • Carution Of Concrete Cubes And Replacement Of The Existing Fence; • Installation; • Installation Photovoltaic With Power Adapted To Energy Consumption By A Water Treatment Plant In A Round, Along With Energy Storage; • Renovation Works In The Building Of A Water Treatment Plant, Including Replacement Of Central Heating Installations, Liabing Walls With Ceramic Tiles, Replacement Of Door Joinery, Roofing, And Renewal Of Internal Rooms And Painting External Walls. Is In Annex 1A To Swz-Design Documentation (Part 1 Of The Order-Connection Of Smólsko Smólsko-Round Water, Along With The Reconstruction, Expansion And Renovation Of The Round Suw), Which Consists Of The Following Documents: 1) Land Development Projects2) Architectural And Construction Projects-Round Stroke 3) Executive And Technical Designs4). Acceptance Of Works (Sstwior) 5) The Number Of Works Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Flat -Rate Nature, The Contractor Should Be Based On The Scope Indicated In The Design Documentation Referred To In Point 4.4.1) Swz And Sstwior. The Bill Of Quantities Is Auxiliary. The Occurrence Of Works Not Included In The Pre -Emptive Or Works In Relation To More In Relation To The Aforementioned Prejudice Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Project Documentation Referred To In Point 4.4. 1) Or Sstwior
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.