3 Stary Rynek 14, • Delivery And Installation Of An Ups Power Supply With A Minimum Rated Power Of 30 Kva/30 Kw To The Server Room Of The Municipal Office In Łomża At Pl. Stary Rynek 14, • Delivery And Installation Of An Ups Power Supply With A Minimum Rated Power Of 10 Kva/10 Kw To The Server Room Of The Municipal Office Departments Located In Łomża At Ul. Nowa 2, Together With Comprehensive Design Works With All Necessary Arrangements And The Implementation Of Necessary Construction And Electrical Works Related To The Assembly Of The Aggregate And Power Supplies Ups.2. The Scope Of The Order Includes: 1) The Separation And Preparation Of A Place For The Server -Plating System Of Emergency Power Supply On The Registration Plot Number 10404 Or 10406; 2) Assembly And Connection Of The Aggregate To The Switchgear Together With Adapting It To Efficient And Trouble -Free Operation. It Is Required That The Permissible Interruption Time Between The Power Switching Meets The Class A Reliability Class; 3) Reconstruction Of The Internal Power Supply Line Of The Server Room Switchgear - The Main Switchgear Of The City Hall; 4) Execution Of The Server Room Switchgear Inside The Server Room In Order To Ensure Equal Load At Each Phase And Correct Protection Of The Circuits. Servers Reserve Power Supply Must Be Equipped With A Szr System That Allows You To Automatically Switch The Aggregate To The Installation At The Disappearance Of The Basic Power Supply From The Pge Dystrybucja S.A. Electricity Network; 5) Delivery And Assembly And Adaptation To The Efficient And Trouble -Free Operation Of Two Ups Emergency Power Supplies With A Minimum Power Of 30 Kw And 10 Kw; Multi -Branch, Taking Into Account All The Necessary Arrangements Min. Agreeing The Project With Fire Protection Appraiser, Agreeing The Project From Pge Dystrybucja, Agreeing The Project With The Conservator Of Monuments. The Design Documentation Must Include: • Adaptation Of The Place For The Installation Of A Power Generator Together With Supplying The Power Supply To The Main Switchgear, • Reconstruction Of The Main Switchgear, • Reconstruction Of The Server Room Switchgear Together With The Even Burden On The Server Plants, • Adaptation In Terms Of Fire Regulations, • Electrical Inventory And Detailed Electrical Schemes Of The Designed Changes. 7) Making All Necessary Changes. 7) Works Related To Assembly And Connecting The Aggregate To The Facilitys Supply System, Via: • Installation Of A Power Generator With An Electrical, Fuel And Exhaust Supply System, • Reconstruction Of The Main Switchboard, • Reconstruction Of The Server Room Switchboard, • Execution Of Necessary Cable Connections In Order To Attach The Aggregate To The Server Power Supply System, • Execution Of A Temporary Installation Ensuring The Maintenance Of A Temporary Installation. Implementation Of Works Related To Reconstruction. 2. A Detailed Description Of The Subject Of The Contract Is Included In Annex 7 To Swz (Description
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.