Wastewater Treatment Plant Construction Work - Installation Of Waste Education And Koroni Waste Controls (Edl). The Project Will Be Executed In K. Koronis, Of The De. Koronis, The Municipality Of Pylos - Nestor Of The Prefecture Of Messinia In The Peloponnese Region In Greece. In Summary, The Projected Sewage Treatment And Disposal Installation Is Made Up Of The Following Units: (1) Input Projects. The Sewage Is Driven To The Hdpe 280 10 Atm Depressive Conductor. Includes The Arrival Well And, If Required By The Final Study, Lifting Pumping Station. (2) Pre -Treatment. Includes The Sinking, Evaporation And Deflection Of Incoming Sewage And The Host Unit. Pre -Treatment Equipment Is Projected To Be As Automated As Possible To Minimize Peoples Contact With Pre -Treatment By -Products (Rashes, Sandy Sand, Etc.). Suspension, Examples And Deflection Can Be Done In A Properly Prefabricated Compact Type Processing Assembly. (3) Primary Sedimentation. It Is Envisaged To Have Appropriate Provisions For The Removal Of Sludge And Floating. (4) Biological Treatment. Biological Treatment Achieves Biological Removal Of Phosphorus, Nitrification And Conjidialization, As Well As The Degradation Of The Organic Load. The Method Of Active Sludge With Membranes For The Separation Of Liquid - Solids (Mbr) Will Be Applied For Biological Treatment. Biological Reactors, Membranes System And Sludge Recirculation Are A Single Process, The Degree Of Performance Of Which Depends On The Combined Design Of The Individual Units. Biological Treatment Includes: - Tank And Balancing Pumping Station - Finance Are - Biological Phosphorus Removal - Biological Reactor - Ventilation System - Membrane System - Illy - Illyi Pumps (5) Chemical Removal. For The Chemical Removal Of Phosphorus, If Necessary, A Crocodile Will Be Added To The Biological Treatment Well. (6) Higher Editing. Includes Disinfection With Chlorination And Detection. (7) Editing Sludge. Includes The Sludge Temporary Storage Tank And The Mechanical Dehydration Unit. (8) Wastewater Disposal. Includes Storage Tank With The Disposal Of Treated Sewage In The Stream And Irrigation Network At The Boundaries Of Pure Water Installation. (9) Auxiliary Networks - Space Configuration. The Auxiliary Networks Include A Network Of Drainage, Water Supply Network, Industrial Water Network And Firefighting Network. (10) Control And Operation System. The Control Of The Most Important Features Of The Installation Will Be Carried Out With The Help Of The Center For The Installation Control (Kel) And Local Control Stations That Will Be Installed In Individual Areas Of The Project. The Design Of The Installation Is Done According To The Approved Aepo. Due To The Present Years Of The Implementation Of The Study And For Energy Saving Reasons, It Could Be Requested By
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.