Drilling And Installation Of 04 (Four) Monitoring Wells With Up To 15M Each; Drilling Technician Report; Elaboration Of The Geological Profile Of The Piezometric Wells; Photographic Technician Report; Potentiometric Map; Construction Profile Of Monitoring Wells; Project Of Installation Of Piezometric Wells; Included All The Necessary And Relevant Materials For The Installation; Art Of The Technical Responsible. 04 (Four) Water/Soil Samples For Laboratory Analysis With Parameters: Total Chloride, Conductivity, Apparent Color, Phosphate, Nitrogen Nitrogen Kjeldahl, Nitrogen Nitrate, Nitrogen Nitrite, Ph, Sulfate, Sulfate, Sulfate, Sulfate Turbidity, Heterotrophic Bacteria, Clostridium Perfringens, Total Coliforms And Escherichia Coli; I Included All Necessary Materials, Technical Report In Water/Soil Analysis; Art Of Technical Responsible.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.