The Project For Repairing A Playground With Asphalt Pavement At Sofia University Karavelov Dobrich With Dimensions 25M X 40 M, An Area Of 1000 Sq.M, Reflects The Investment Intentions Of The Contracting Authority And Is Drawn Up In Accordance With The Approved Detailed Development Plan And The Current Regulations. The Terrain Intended For The Construction Of A Sports Ground With A Depreciated Asphalt. The Project Does Not Affect The Buildings In The Property And Does Not Envisage The Separation Of A Separate Entrance/Exit To The Property. The Existing Asphalt Pavement, Which Is In Poor Condition, Is Cleaned, Dug For Foundation, Forming A Formwork, Reinforcement Is Laid And Concrete Foundations Are Poured. The Asphalt Pavement Is Milling, The Bitumen Spill Is Applied To The Connection And A New Layer Of Dense Asphalt Mixture. The Playground Is Surrounded By An Openwork Metal Fence Mounted On A Strip Reinforced Concrete Foundation. The Fence System Is 4.00M High And 7.00 M, Made Up Of Poles And Fence Network. The Pillars Are Made Of Steel Profile F 83 Mm With A Height Of 4.10 And 7.10M Respectively. The Pillars Are Mounted On The Short Side Of The Playground At 2.75M And On The Long One At 2.84M. There Are Also 4 Lighting Ladder With A Height Of 8.00M. The Playground Will Be Drawn With A Different Color For Each Playing Field, Respectively For Football, Volleyball, Tennis And Basketball. The Playground Is Equipped With A Football Set, Located In The Middle Of Its Two Short Sides.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.