1. The Subject Of The Contract Is The Implementation Of The Investment In The Design And Build System, Consisting In Carrying Out Design Works, Obtaining The Appropriate Arrangements And Permits Required By Law, Preparing The Square For Construction, Performing Construction, Assembly And Installation Works For The Project: Improving The Energy Efficiency Of The Health Center Building In Czercya Płasyńska. In The Formula Design And Build The Following Scope Of Work And Works: 1) Developing Multi -Branch Project Documentation (In 3 Copies - Construction Design And Executive Projects) For The Implementation Of The Thermomodernization Of A Public Building; 2) Obtaining All The Necessary Current Maps For Design Purposes, Conditions, Arrangements; 3) Conducting All Necessary Administrative Procedures Completed By Obtaining A Building Permit (If Required); 4) Transfer To The Employer 3 Copies Of The Agreed And Accepted Technical Documentation And Material And Financial Schedule Of Construction Works; 5) Comprehensive Implementation Of Thermomodernization Works In Accordance With The Guidelines Resulting From The Energy Audits Carried Out And Arrangements Made With The Employer; 6) Carrying Out Checks, Carrying Out Installation Tests, Starting And Adjusting The Installation (Regarding The Central Heating Installation); 7) Execution (In 3 Copies) As -Built Documentation; 8) Preparing, Obtaining The Users Signatures And Submitting Complete Connection Documents Of Solar Installations (Notification Of Connecting Micro -Installations / Application For Determining The Conditions For Connecting Micro -Installations To The Network / Micro -Installation Document Of Pge Dystrybucja Sa); 9) Monitoring The Status Of Submitted Documents At Least Until The Installation Is Connected To The Power Network (If Necessary - Developing Corrections For Submitted Application Documents); 10) Training Of Users; 11) Preparation Of Operating And Maintenance Instructions; 12) Transfer To The Employer 3 Copies Of As -Built Documentation, User Manual And Maintenance And A Set Of Warranty Cards; 13) Developing A Buildings Energy Characteristics Certificate. The Scope Of Thermomodernization Works: 1) Modernization Of Partitions: A) Insulation Of External Walls - Total Area: 436.96 M2; B) Ceiling Insulation - Total Area: 278.50 M2; C) Restoration Of The Facade, Roofing, Etc.; 2) Replacement Of Window Joinery (Total Area: 107.91 M2) And Door (Total Area: 6.03 M2); 3) Modernization Of The Heating System - Replacement Of The Existing Heat Source With Ecological (Ground Heat Pump With A Capacity Of Min. 30.0 Kw With Electric Heaters/Electric Boiler As A Peak/Emergency Source), Delivery And Assembly Of Additional Electrical Devices Ensuring Periodic Heat/Cold Production; 4) Modernization Of The Existing Central Heating Installation; 5) Installation Of A Hybrid Photovoltaic Installation With A Power Of Min. 20.0 Kwp Together With The Energy Storage System With A Capacity Of Min. 20.0 Kwh; 6)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.