3 Integrated With A One-Sided, One-Walled Long Hill,- Construction Of A Sports Path With Obstacles On A Wheel Plan With Polyurethane Surface,- Construction Of A Javelin,- Construction Of A Hammer And Disk Viewer,- Demolition Of The Old Playground And Its Fences And The Construction Of A New Fenced Playground,- Dismantling Of Closed Underground Tanks,- Assembly 2 System Gates In An Existing Fence,- Disassembly Of Sports Gates From An Existing Sports Field In Order To Transfer Them To A New Playground,- Demolition Of Paved Surfaces In The Western And Southern Plot Of The Plot Intended For The Investment,- Construction Of A Parking Lot With An Internal Road,- Construction Of Pedestrian Routes,- Planting Green In The Form Of Insulating, Compositional And Grass Greenery,- Hardening Of The Area, Small Architecture- Fence Of The Area. 2. The Contractor Is Obliged To Obtain A Decision Of The Use Permit. The Use Permit Means The Obligation For The Contractor To Obtain On The Basis Of Power Of Attorney Granted By The Employer And On The Basis Of Documentation Obtained And Prepared By The Contractor, The Decision To Use The Use Of The Facility, Which Will Arise As A Result Of The Performance Of The Subject Of The Contract. 3. Note - The Ordering Party At The Stage Of Submitting Offers Does Not Require The Submission Of In Question, Including The Surfaces Referred To In The Technical Project - The Architectural Industry Point 5.1.5.2. The Documents Will Be Required During The Implementation, In Accordance With The Template Of The Contract § 7 Item 36). 4. The Detailed Scope Of Works Is Determined By The Design Documentation, The Bill Of Quantities, The Adopted Notification Of The Construction Or Implementation Of Other Construction Works (Pb-2) Of 18.03.2025 And The Specification Of The Terms Of The Contract. 5. The Employer Informs That It Does Not Have A Pre -Held Work In The Format Of The Ath.6 Cost Estimate. The Price Is A Cost Estimate With The Offer, Offer Cost Estimates Should Be Submitted On The Basis Of Attached Daily Works. The Lack Of Attached Cost Estimates Will Result In The Rejection Of The Offer. 7. The Employer Allows The Use Of Polyurethane Surfaces Made In Spray Technology, In Accordance With The Applicable Pn-En 14877: 2014 Standard And The Current Guidelines Of World Athletics.8. The Employer Shared The Documentation Necessary To Perform The Subject Of The Contract In Its Resources. Under The Contract, The Contractor Is Obliged To Obtain All Necessary Decisions, Permits, Opinions, Approval Of The Conditions And Other Documents Necessary To Carry Out Construction Works Covered By The Order. 9. The Contracting Authority Has A Certificate Of 06/03/2023 Issued By The Poviat Eldership In Słubice Indicating No Grounds To Object To The Works Reported On 30.01.2023 Consisting In The Construction Of The Recreation And Sports Area At The Primary School In Golice And The Contracting Authority To Start Work Within Three Years From The Date Of The Ent
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.