1. The Subject Of The Contract Is The Design And Execution Of Construction Works Consisting In The Adaptation Of Parts Of The Rooms For The Social Services Center In The Building Located At Ul. July 17, 27 In Czeladz As Part Of The Peparter Project: Cus-A New Look At Social Services Co-Financed By The European Union Under The European Funds Program For Silesia 2021-2027, Priority Fesl.07 European Funds European Funds, Measure 7.5 Strategic Projects For Social Services Area, Type 4. Coordination Of Social Services-Spreading And Creating Cus.2. The Order Of The Contract Includes In Particular: 2.1. The Construction And Renovation Of The Premises Of The Entrance Zone And Parts Of The Ground Floor Rooms In Order To Adapt To The New Function For The Social Services Center And Separate New Rooms And Zones Within It, 2.2. The Building Of External Stairs And The Installation Of An External Vertical Lift For Disabled People At The Main Entrance To The Building, 2.3.3 Elevator And Assembly Of A Passenger Crane Communicating 3 Floors Of The Facility With A Minimum Load Capacity Of 630Kg/8 Work, 2.4 Separation Of New Rooms With Brick And Glass System Walls, 2.5. Replacement Of Renovation Works Such As Laying Cladding On The Walls And Floor, Assembly Of The Suspended Ceiling, Door Replacement, Painting, 2.6. Removal In The Modernized And Rebuilt Part Of The Building Of Complete Installations Together With Devices And Fittings Guaranteeing Their Proper Functioning: 2.6.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1 Sanitary Water, Sewage, Central Heating, Installation Of Mechanical Ventilation And Air Conditioning, 2.6.2. Electrical Installations Of General, Emergency And Escape Lighting, Plug Sockets And Special Sockets2.6.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3. Ict, 2.7. Completion Of The Completion Of The Works And Obtaining Its Acceptance By The Ordering Party. 2.8. Propolation Of The Permit To Use The Object. 2.9. Other Elements Not Listed Above And Resulting From The Functional And Utility Program With Attachments Parts Of The Rooms In The Building Of The Social Service Center In Czeladz Together With Attachments, 3.7.2.Swzw With Attachments, 3.7.3. Established Provisions Of The Contract, 3.7.4. Conquers For Questions Answered During The Tender Procedure (If Concerned), 3.7.5 Documents Should Be Treated As Complementary. All Requirements Specified In The Documents Indicated Above Constitute Minimum Requirements, And Their Fulfillment Is Obligatory.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.