Tenders Are Invited For Development Of Documentation For The Reconstruction And/Or Expansion Of Municipal Roads Number 114212E And 114811E On Sections Waszkowskie - Grabówka And Waszkowskie - Nieczuj
Tenders Are Invited For Development Of Documentation For The Reconstruction And/Or Expansion Of Municipal Roads Number 114212E And 114811E On Sections Waszkowskie - Grabówka And Waszkowskie - Nieczuj
1. The Subject Of The Order Is The Task Entitled Development Of Documentation For The Reconstruction And/Or Expansion Of Municipal Roads Number 114212E And 114811E On The Waszkowskie - Grabówka And Waszkowskie - Nieczuj Sections. The Task Applies To The Expansion (And / Or Reconstruction) About 2480 Meters Of Road Sequence, Which Consists Of Part Of The Municipal Road 114212E (From The Already Rebuilt Section - At The Height Of The Adjacent Land Plot Of The Area Of Col. Waszkowskie No. 26 - To Connect With The Municipal Road No. 114811E) And Municipal Road 114811E - To Join (Intersection) With Poviat Road No. 1717E Biadaczew Brzeźnica. 2. As Part Of The Study, The Contractor Will Also Develop A Project Documentation (As A Separate Part) Of The Reconstruction (And/Or Expansion) Of About 315 Meters Section Of Municipal Road No. 114212E, Running From The Interface With The Municipal Road 114811E Towards The Town Of Nieczuj (From The Intersection At The Road Plot No. 494 Of The Grabówka District For Intersection At The Intersection At The Area Not Feel). 3. The Design Study Should Take Into Account At Least: A) Conditions Issued By The Poviat Road Manager (Until The Contractor Obtained), B) Designing The Road Structure With Asphalt, Double-Layer (Kr-1) Surface 5.0-5.2 M Wide (Acceptable Local Deviations As To The Width-As Long As They Fit Within The Relevant Regulations And Are Permissible As Part Of Calls For Co-Financing Of Road Investments, Conducted By The Voivodship Office In Łódź In 2024), C) Designing Rainwater Development Solutions, D) Designing Such Inclusion In The Poviat Road, Which Will Provide Solutions For Traffic - Enabling In Particular Free Turns Of Vehicles (Especially Agricultural And School Buses) With And To The Poviat Road, E) Designing Intersections / Exits On The Lower Row And Exit Built -In - Made Of Asphalt Concrete And Adapted To Existing Entrances / Gates / Gates (Possibly Including Their Corrections). For Culverts - The Front Structure Should Be Designed So That It Is Not Taken Above The Level Of Exits. Wing Or Similar Culvert Foreheads. F) Designing Entrances / Enter Into Undeveloped Properties - Made Of Aggregate, G) Designing Elements Of Horizontal And Vertical Marking And Elements Improving Movement Safety, H) Designing (If Necessary) Removal Of Collision With Existing Networks / Hydrants, Etc. Infrastructure, I) Developing The Zrid Procedure - If Necessary For The Investment (The Contracting Authority Assumes Such A Situation).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.