Tenders Are Invited For Reconstruction Of The Jordanówka Pavilion Building Together With The Inside Of The Electr. And Sanit.

Tender Detail

98475320
NP.26.2.68.25.BT
Self-Funded
Tenders Are Invited For Reconstruction Of The Jordanówka Pavilion Building Together With The Inside Of The Electr. And Sanit.
NCB
central europe
European Union
14-07-2025

Work Detail

1. The Subject Of The Procedure And Contract Is The Selection Of A Contractor For Construction Works Related To Modernization - Reconstruction Of The Jordanówka Pavilion Building Together With Internal Electrical And Sanitary Installations, Accessories And Lifts For Disabled People And Modernization - Renovation Of The Garbage Building, At Al. 3 Maja 11 In Krakow, For The City Green Board In Krakow. 1.1 Pursuant To Art. 310 Of The Pzp Act, The Contracting Authority Provides For The Possibility Of Annulment Of The Proceedings In Question, If The Public Funds That The Contracting Authority Intended To Allocate To Finance All Or Part Of The Contract, Were Not Granted To Him. Jordanówka Together With Internal Electrical And Sanitary Installations, Performance And Lifts For The Disabled And Modernization - Renovation Of The Dustbin Building In The Park I.M. H. Jordan, At Al. 3 Maja 11 In Krakow On Plot No. 182/5 K-12 Unit Krowodrzas Record, Based On Attached Project Documentation And Decision.1.3 The Said Order Of The Renovation Of The Jordanówka Building Is Finally Described In The Documents Listed Below: 1.3.1 Decision Pnb No. 658/6740.2/2022 Of 09.12.2022. Sign: Au-01-2.6740.2.660.2022 12, J.Ew. Krowodrza By Mgr Inż. Arch. Mirosław Stępień, 1.3.2 Permission No. 1041/22 Of 25.10.2022. Municipal Conservator Of Monuments Sign: Kz-03.4125.1.121.2022.Mt, E.G. 1.4 Other Decisions And Permits Have Been Included In The Description, Because The Above Renovation Of The Building Itself And The Trash Is Included In The Comprehensive Task Of The Entire Jordan Park, To Which The Decisions And Conservation Permits Listed Below Refer. 1.5 The Works Should Be Carried Out In Accordance With The Design Documentation, Technical Specification And Acceptance Of Construction Works (Called Stwiorb) And The Works Of Works. Part Of Swz Necessary For The Performance Of The Subject Of The Contract Are The Materials Attached To Swz, And In Particular Design Documentation With Arrangements, Stwiorb, Items, Tables Of Manufactured Elements (Maintenance, Property), Patterns Of Materials Approval Card, Subcontracting Patterns, Protocol Patterns, Guidelines, Equivalence Table And Other Zip). The Contracting Authority Points Out That It Has The Right To Update The Designs During The Proceedings And During The Construction Of The Construction. In Point 5) 7., Swz And Annex 8 To Swz.1.9, The Employer Informs And Emphasizes That In Accordance With Point 31), In Order To Read The Place Covered By The Subject Of The Contract, The Contracting Authority Organizes A Local Vision On 02.07.2025. At: 11:00. Participation In A Local Vision Is Obligatory, The Contracting Authority Requires Submitting An Offer After The Contractor Has Completed A Local Vision. At The Same Time, The Employer Informs That Pursuant To Art. 226 Para. 1 Pzp Rejects The Offer If It Was Submitted Without A Local Vision, If The Contracting Authority Required This In The Documents Of The Order. 2. The Contractor Should Com

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail