1. The Planned Investment Includes The Thermomodernization Of The Building Of The School Complex In Trzcinica, And In Particular: 1) Construction Works: A) Demolition Works, B) Roof Insulation (About 535M2), Roof Covering With A Pvc Membrane With Accompanying Works, Flashing, Chimney Renovation, Replacement Of Sewage Exhausts, Replacement Of Gutters And Pipes. Trigger, C) Replacement Of Window Joinery (Approx. 275.08 M2) And Door (Approx. 17.71M2), Along With The Assembly Of Dark Blinds, Protective Meshes, Window Sills, D) Insulation Of Walls And Jams (Appro Disabled. 2) Ventilation And Air Conditioning: A) Ventilation - Assembly Of The N1w1 Ventilation System (Gym), Assembly Of Ventilation W2, W3, W4, W5 (Bathroom Rooms); B) Air Conditioning - Assembly Of Air Conditioning In A Computer Lab Room With A Capacity Of Approx. 5.2/5.6 [Kw]. 3) Sanitary Works: A) Boiler Room: • Demolition Of Existing Gas Boilers Together With Technical Installations And Devices, Demolition Of Existing Internal Combustion Chimneys. On Pelletb) School Building: • Necessary Modifications To The Water And Sewage System In The Bathroom For The Disabled, • Assembly Of Adjustment Valves At Radiators, Note: The Contractor Will Agree With The User Of The Facility A Detailed Date For The Implementation Of Work On The Replacement Of The Heating System And Hot Water. 4) Electrical Works: A) Installation Of The Tg2 Switchgear And Circuits Supplying The Ventilation And Air Conditioning Control Panel). Installation Of Led Luminaires With Partial Warning, C) Execution Of The Lightning Protection System, D) Dismantling And Assembly Of The Existing Photovoltaic Installation, E) Assembly Of An Additional Solar Installation Min. 7.56 Kwp, F) The Necessary Modifications To The Electrical Installations In The Bathroom For Disabled People Do Not Include The Installation Of The Energy Storage. 5) Deliveries: A) Delivery And Assembly Of Electric Car Charger, B) Delivery Of Staircase, Induction Loop And Typhlographic Plan. 2. Construction Works Should Be Carried Out In Accordance With The Provided Design Documentation In The Areas Given In The Above Description. 3. A Detailed Description Of The Subject Is Included In The Design Documentation (Annex 5 To Swz), In Technical Specifications For The Execution And Acceptance Of Construction Works (Annex 6 To Swz) And In The Draft Contract (Annex 7 To Swz).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.