1. The Subject Of The Order Is The Reconstruction Of The Building Of The Environmental Community Center In Sułków Along With The Adaptation Of The Attic To The Warehouse And Sanitary Function. The Planned Reconstruction And Adaptation Of The Attic Involves Separating Additional Rooms In The Attic Of An Existing Building. No Changes Are Made At The Ground Floor Level. In The Attic There Will Be Storage Rooms/ Wardrobes As Well As Toilets For Staff. Access To The Attic Will Be From A Vestibule Of An Existing Building. In Addition, The Installation Of Cold, Hot Water, Circulated Water, Sanitary Sewage, Central Heating Installation, Internal Electrical Installation And Ventilation Installations And Ventilation Installations. Utility Area Of The Facility: Existing Condition: 236.27 M2 Designed: 387,05 M2 Total Surface: 283,08 M2, Gross M2kubature: Existing State: 1710.33 M3 Designed State: 1710.33 M3 M3 In The Ridge: Existing State: 8.50 M Designed State: 8.50 Love Of Floors: Existing Condition: 1 Designed State: 2 Fester Works Should Be Carried Out Based On The Final Decision Of The Permission To Build The Building No. Ab.6740.1778.2021.Ig 30.12.2021 And A Replacement Decision Ab.6740.4.114.2024.W Of 20.12.2024 The Detailed Scope Of Quantitative Work Was Presented In A Pre -City, Which Is In Line With Technical Documentation And With Them An Attachment To Swz. The Tender Procedure Covers Only Construction Works Carried Out In The Building Of The Environmental Community Center In Order To Adapt The Attic As A Warehouse And Sanitary Function. Construction Of A Shelter (Outdoor Scene) Is Not The Subject Of This Tender Procedure. Note! In Connection With The Fact That The Attached Technical Documentation Covers A Larger Scope Of Works Than The Scope Covered By This Order, The Contractors Are Undertaken To Submit An Offer To The Scope Specified Below And Included In The Pre -City Of Works Attached To This Swz.2. The Main Scope Of Works Includes: 2.1) General -Based Works: Safety Robots, Ceiling Housing And Outer Knee Walls From The Inside With Gkf Plates - An Additional Plate For Existing Gkf Housing For Ei 60 Fire Resistance - Gkf 260 M2 Investor, Gkf Peak Wall Housing For Ei60 Fire Resistance. Gk Plates, Finishing Works- Platelet Arrangement, Filling Small Elements (Valve Door), Double Painting With Emulsion Paints With Priming, Making Strokes, Making Floors From Tiles Tiles After Prior Priming, Arranging The Tiles From Gres Tiles, Assembly Of Door Frames And Door Wings, Planting Windows In The Roofing. Debris Together With Utilization. 2.2) Works In The Field Of Water Installation Water Supply In The Building, Tightness Of The Installation, Laying The Thermal Insulation Buffers, Installation Of A Washbasin Battery, Pvc Tee With Sealing, Sewage Cleaning, Laying Pipelines Made Of Sewage Pvc, Drainage Approaches, Installation Of Drainage Approaches, Assembly Of Porcelain Washbasin With A Pear Siphon And Toilet With Compact Rinses The Need To Run The Ins
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.