The Measure Ribe Ceiling In The Ug1 Of The Tagblatt Tower Underground Car Park Mainly Includes The Following Services: Reprofilization Of The Ceiling With Concrete Replacement In The Spray Order Local Concrete Repairs Closing The Ceiling In The Opening Areas Via A Reinforced Concrete Cross -Section Order Of A Fire Protection Plaster In The Spray Process Installation And Connection Of Line Drainage To The Existing Drainage Line The Floor Area Of The Floor Is Approximately 400 M² For Side Dimensions Of Around 16 M X 26 M.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.