Epcor Requires A Feasibility Study For Nv34b Conversion To Provide Power To Atb Place South Tower. The Downtown Network System Consists Of Two Main Secondary Voltages: 120V/208V Grid Network System And 347V/600V Spot Network System. As The 600V Spot Networks Have Higher Fault Currents And Arc Flash Risks, Epcor Plans To Convert All Spot Network Systems To A Primary Select Radial System
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.