- Site Signage. - Clearing, Tree Slaughter And Stealing Of Wooded Areas. - Diversion Of The De Corbé Stream; - Hijacking Of The La Vire Stream; - Territy In Cuttings And Embankments For The Realization Of A Retention Dam Above The Vire And Along The Railway Tracks, A Crowning Track For Access To Hydromechanical Equipment In Brushed Concrete And Different Trenches. - The Leveling Of Platforms (Dike). - The Implementation Of A Clay Seal Protected By Anti-Rowing Membrane. - The Realization Of A Safety Dump With Courier And Dissipation Basin. - The Realization Of A Concrete Pertuis With Flow Rate Of Flow And Internal Safety Spill. - Valve Adjustment. - The Establishment Of Under-Foundations, Foundations Of New Infrastructure As Well As Trials Against The Backdrop Of Trunk And Piergreen. - The Realization Of Concrete Riprap. - The Realization Of A Stacked Access Path To The Dike. - The Realization Of An Access Path To The Railway Tracks. - Disassembly And Replacement Of Fences, As Well As The Installation Of New Fences At The Foot Of The Dike Embankment And A Levante Barrier At The Entrance To The Access Track. - The Implementation Of Turning Lands, Sowing And Possible Plantations. - The Maintenance Of Work And Works During The Work Period And During The Warranty
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.