Expression Of Interest For Consulting Services - Firms Selection To Technical, Safety, Environmental And Production Status Of Upstream Operation In The Amu Darya Basin. The Ministry Of Mines And Petroleum Of The Islamic Emirate Of Afghanistan Plans To Conduct An Assessment Of The Technical, Safety, Environmental, And Production Status Of Upstream Operations In The Amu Darya Basin In Accordance With International Standards. This Assessment Will Be Based On International Standards Such As Api, Iso, Iogp, Ifc, Ebrd, Wb Hse, And The International Society Of Petroleum And Gas (Spe) And International Best Practices. Objectives Of Assignment: The Assessment Should Ensure That Amu Darya Basin Operations Are Conducted In Accordance With Api (American Petroleum Institute), Iso (International Organization For Standardization), Iogp (International Association Of Oil & Gas Producers), Ifc/World Bank Hse Performance Standards, And Spe (Society Of Petroleum Engineers) Standards. Scope Of The Services Technical & Production Evaluation Technical Inspection Of All Relevant Production Equipment (Separators, Pumps, Compressors, Tanks) According To Api 650, 620, 610 Standards. Inspection Of All Existing Well Technical Files, Such As Logs, Gtos, Pvt Data, Well Test Results And Other Relevant Data. Production Regime And Well Pressures Surveillance. Analysis Of Artificial Lift (Gas Lift, Esp, Rod Pump) And Other Relevant Systems Evaluation. Asset Integrity & Maintenance Analysis Of Oil Storages, Pipes, Tubes, And Surface Equipment According To Api 570, Api 653, Iso 55001. Preventive Maintenance Of Field Facilities According To Iso 14224. Risk Analysis According To Api Rp 580. And Other Relevant Assessment Required. Well Integrity Assessment Well Design Analysis (Casing, Cement, Completion) As Per Iso 16530, Api Std 53. Well Integrity (Pressure Integrity, Annular Pressure Management) & Other Relevant Well Integrity Assessment Needed As Per Api Rp 90, Iso 15156 Health, Safety & Environment Assessment Evaluation Of Hse Policies And Measures According To Iso 45001, Iso 14001, Api Rp 75. Fire Protection System Analysis According To Nfpa, Api Rp 2001. Environmental Risks (Air Emission, Water Discharge, Waste Handling) According To Ifc, Wb, Ebrd Performance Standards. Emergency Response Plan According To Api Rp 1174, Iso 22320. Production Optimization Assessment Spe Reservoir Management Best Practices For Production Analysis And Improvement. New Strategies For Production Enhancement (Eor, Ior). Artificial Enhancement Systems And Effectiveness Assessment. Tender Link : Https://Momp.Gov.Af/Index.Php/Tenders