Part I - Energy Modernization In The Volunteer Fire Brigade Building In Murzynów. The Investment Is Included In: • Insulation Of The Flat Roof By Arranging The Eps Polystyrene Panels 100 Thick 22 Cm Thick And Making A New Roofing, • Replacement Of Windows In The Building For Windows Meeting The Current Technical Conditions Set Out In The Regulation Of The Minister Of Infrastructure, • Air Pump Installation Air, • Replacement Of The Electrical Installation (Main Switchgear, Wires, Sockets, Switches), • Replacement Of Lighting Fixtures For Energy -Saving Led Type, • Assembly Of Solar Installation On The Roof Of The Building, • Execution Of Lightning Full Brick, 10 Cm Thick Insulated From The Outside. The Roof Is Made Of Channel Plates, On Which A Layer Of Hearth Speedway Was Laid And A Concrete Swim Was Poured. Roofing Is Papa. Window Joinery Made Of Pvc With A 2-Fast Package. Heating System Based On Old Type Electric Heaters. The Condition Of The Existing Electrical Installation Is Bad. The Concealed Plug -In And Lighting Installation - Partly Made Of Aluminum Cables, Without Protective Cables. Lack Of Lightning Protection Installation.B) Design Condition • Insulation Of The Flat Roofing With Existing Flat Roofs Will Be Arranged Eps 100 Polystyrene Slabs With A Total Thickness Of 22 Cm, And Then A New Roofing Along With Tubes Will Be Made. During The Works Related To The Insulation Of The Cepestorms, Existing Gutters Will Be Dismantled, Which Will Be Installed Again. The Existing Drain Pipes Will Be Extended By The Thickness Of The Flat Roof Insulation Along With The Replacement Of The Windows, External Window Sills Will Also Be Replaced. • The Heating System Heating System Will Be Based On The Air -Air Heat Pump. The System Will Be Equipped With:-External Unit From Gree Gwhd (42) Nk600, With A Heating Power Of 12.3 Kw, Mounted On The Building Facade Or Equivalent; -The Internal Spilital Units From Greek, Fairy White Model: O Gwh09acc-K6dna1f/I Fairy White-A Unit With A Nominal Power Of 2.7 Kw Or Equivalent, Room No. 4; O Gwh12acdxf-K6dna1a/I Fairy White-Unit With A Nominal Power 3.5 Kw Or Equivalent, Room No. 3; Gwh18acdxf-K6dna1a/I Fairy White-A 5.3 Kw Nominal Unit Or Equivalent, Rooms No. 1. In The Sanitary Room (No. 5), The Installation Of An Electric Heater With The Possibility Of Temperature Adjustment. Full Protection And Surge Protection Are Foreseen. The Internal Power Line Will Be Made From The Measuring System To The New Rg Main Switchgear. As Part Of The Electrical Work, The Following Includes:- Installation Of The New Rg Main Switchgear (Surface Modules, 6X18 Modules) With The Main Current Switch 125A;- Installation Of The Te1 Table (18 Modules, 1 Government, Dimensions 200X400x91 Mm) Supplying, Among Others Outdoor Unit Of The Heat Pump;- Pass 21 Lighting Luminaires To Modern Led Type;- Construction Of A New Installation Supplying Lighting And 230V Plug Sockets And 400V Force Circuits;- Replacement Of Switches And Plug-In Sockets For
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.