1) The Subject Of The Contract Is The Construction Of A Skeletal Network Based On Fiber Optic Cables In The Cieszyn Campus (Ul. Bielska, Ul. Niemcewicza, Ul. Kołłątaj, Ul. Paderewskiego, 43-400 Cieszyn). The Subject Of The Contract Also Includes The Preparation Of The Industry Concept For The Telecommunications Part Together With The Acceptance Of The Ordering Party. The Concept Should Be Developed For The Whole Task. 2) The List Of Fiber Optic Connections Is Presented In Stwiorb (Annex 2.1 To Swz), The Lengths Are Approximate And Are Subject To Verification And Agreement In The Industry Concept Covered By The Subject Of The Contract. 3) The Basic Purpose Of The Subject Of The Contract Is To Make A Skeleton Of An It Network Based On Fiber Optic Connections Along With The Construction Of A Technological Channel, Designed To Connect The Existing Lpd Distribution Wardrobes (Local Access Point) With The Server Room (Gpd Wardrobe - Main Access Point) Located In Building G. Campus Administration. The Above Should Be Made In The Topology Of The Stars, Where The Focal Point Is The Rack Wardrobe In The Room Of The Newly Emerging Server Room (Gpd) .4) As Part Of The Subject Of The Contract, The Full Range Of Construction Works Included In The Order Documents And The Concept Agreed With The Employer Should Be Carried Out. 5) The Scope Of The Subject Of The Contract Includes: A) Developing The Concept Of Ict Skeleton, Obtaining The Required Arrangements And Acceptance Of The Ordering Party, B) Production Through The Ceilings And Walls, C) Installation Of Routes And Cable Troughs, D) Installation Of Fiber Optic Wiring In Existing And New Cable Routes, E) Installation Of Fiber Switch Switches (In Existing Closet (In Existing Closet Rack), F) Delivery Of Patchcords, G) Introduction, Spreading And Installation Of Cables In Cable Switches, H) Installation Of Technical Sewage System With Cable Well Installation, I) Fire Protection Sealing Of Installation Passages Through Partitions, J) Measurements Of Fiber Optic Wiring System (Reflectometric And Transmission In Two Directions), K) Temporary, L) Geodetic Inventory, M) Preparation Of As -Built Documentation. The Contracting Authority Does Not Require The Submission Of Cost Estimates With The Offer. In The Case Of Submitting The Cost Estimates By The Contractor Together With The Offer, They Will Not Be Assessed At The Stage Of The Examination And Evaluation Of The Offers.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.