4. Subject Of The Contract - Description And General Information 4.1 The Subject Of The Contract Is The Expansion Of Municipal Roads Ul. Sadowa And Ul. Ożarów Mazowiecki Commune And Construction Of A Rainwater Sewage System In Jaczyce. 4.1.1 The Technical Parameters Of The Streets: A) Ul. Oparkowa:- Road Category- Municipal;- Road Class- D;- Design Speed- 30 Km/H;- Road Cross-Section: Single-Car, Two-Lane With Two-Way Traffic;- Traffic Category- Kr2;- Road Width: 2 X 2.75 M, 2X2.50 M;- Sidewalks: One-Sided Width Of Min. 2.00 M And A Decrease In 2%, The Surface Made Of Concrete Gray Cobblestones;- Surface Of The Asphalt Concrete Road With A Decrease In 2% (One-Sided Or Roof- According To The Situational Plan) B) Ul. Sadowa:- Road Category- Municipal;- Road Class- L;- Design Speed- 30 Km/H;- Road Cross-Section: Single-Tedious, Two-Lane With Two-Way Traffic;- Traffic Category- Kr2,- Road Width: 2 X 3.0 M,- Pavements: Unilateral Width From 1.50 To 2.00 M And A Decrease In 2%, The Surface Made Of Concrete Cobblestones Color Gray,- Surface Of The Asphalt Concrete Construction Road With A Basement Of 2%, 4.2 In The Field Of Construction Works Constituting The Subject Of The Contract, There Are, Among Others For Channel Hatches. Water Supply Valves And Teletechnical Wells. There Is Also A Change In The Type Of Hydrant To Underground. The Rainwater Sewage System Should Be Used:- Pipes With A Diameter Of Φ315mm Made Of Pp Sn8 Connected To Kielichowo On A Rubber Gasket- Delay From The Inlets. Make From The Inlet Pipes With Diameter Φ200 Pp Sn16 Connected To The Rubber Seal4.3 Detailed Description Of The Subject Of The Contract. Annex 1 To Swz- Technical Designation, Which Consists Of:- Technical Design- The Bill Of Distrust Of Road Works And Billitarian Works- Land Development Project Together With The Attachment- A Design Of A Permanent Traffic Organization- Road Traffic- Rainwater Sewage System4.4 The Contractor Of Works Is Responsible For The Quality Of Works And The Compliance Investor/Engineer. Community And Others4.6 The Basic Document For Receiving The Final Works Is The Perceived Work Protocol Prepared According To The Formula Determined By The Ordering Party. 4.7 The Contractor Is Obliged To Check The Bill Of Quantities (It Is Only An Auxiliary Material). A Construction Project And An Executive Project Played The Primary Role Over The Pre -Works. The Offer Should Be Prepared Based On The Attached Construction Project And The Executive Design. The Bill Of Quantities Does Not Constitute Grounds For Calculating The Final Offer Price In The Offer The Costs Of Local Vision Are Borne By The Contractor. 4.9 Undertaking A Local Vision And Checking The Documents Necessary To Perform The Order Available On Site At The Ordering Party Is Not A Prerequisite For Submitting An Offer. In These Proceedings, The Above Does Not Constitute A Premise For The Rejection Of The Contractors Offer Referred To In Art. 226 Para. 1 Point 18 Of The Public Procurement Law. 4.10
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.