The Subject Of The Task Is The Construction Of A Side Road Of Rybna Street 59-61 In Tychy. Existing Condition. In The Region Of The Designed Road There Is Single-Family Housing And Green Areas. Currently Side Road Ul. Rybna Is An Internal Road That Is Accessed To The Property, Has A Bad Technical Stone Surface, Which With Increasing Traffic Of Vehicles, Pedestrians Often Poses A Threat To Both Drivers And Pedestrians. The Purpose Of Building The Road Is To Increase The Comfort And Safety Of Users. The Road Is The Following Devices: • Gas Network • Rainwater And Sanitary Sewage Network, • Water Supply, • Teletechnical Cables And Overhead Network, • Low And Medium Voltage Energy Cables. Design Condition. Road Surface: • Designed Road With A Length Of About 161 Meters And A Width Of 3.30 - 4.90 Meters, Made Of Concrete Cube, Ixes, With A Pavement Structure Corresponding To The Category Of Traffic Kr 2. • Along The Road, Designed Roadside From 20X10 Cm Concrete Cube With Phase, 0.50 - 1.00 M Wide, With A Decrease In 2% Towards The Road. 15X22 Cm On A Concrete Bench, Raised 3 Cm Above The Edge Of The Road. • Individual Conventions Made Of Concrete Cubes 20X10 Cm With Phase, Using Entrance And Away Slants (Min. 1.5: 1.5). Congress From Ul. Rybna, Pavement In Accordance With The Surface Of The Descents And Sidewalks Of The Designed Road, With Racing Rays By R = 3.0M. Release Release: • Release Threshold At Km 0+078.50 With Surface Of Concrete Cubes Of Red, Raised 10 Cm Above The Road, With An Invasion Of 10% Inclination And Road Inclination. Fragments Of The Pavement Along Ul. Fish With A 20X10 Cm Concrete Surface. Technical Lighting And Infrastructure: • Construction Of New Lighting Points Powered From The Designed Lighting Wardrobe, Including The Design Of Cable Inserts On The Collision Sections. For The Existing Rainwater Drainage System Kd300.Infrastructure: • In Connection With The Collision Of The Existing Underground Hydrant, A New Underground Hydrant Was Designed In Place Of The Designed Decorative Granite Stone Band. Telecommunications Cables, Power Cables, Signaling Cables And Technical Infrastructure Devices. The Concise Description Of The Order And The Method Of Its Performance Is Specified In The Offer Cost Estimate And Project Documentation, Developed For The Purposes Of This Order, Which Is Annex 2 And 3 To Swz, Respectively.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.