1. The Subject Of The Contract Is The Implementation Of Construction Works In The Field Of Building An Internal Hydrant Installation In The Building Of Primary School No. 5 Located In Konstantynów Łódzki At Ul. Sadowa 5/7, Consisting Of: 1.1. Execution Of An Internal Hydrant Installation, 1.2. Separation Of Rooms In The Basement Of The Building For A Hydrophore Set. 2. The Material Scope Of The Order Specified In Point 1.1, Includes In Particular:- Installation Of Wires From Galvanized Steel Pipes,- Assembly Of Internal Hydrants Dn25,- Installation Of Cutting Off, Protective Fittings,- Assembly Of The Hydrophore Set (For Lifting Pressure),- Performing Tightness Test,- Rinsing The Hydrant Installation,- Finishing And Cleaning Work. 3. The Material Scope Of The Order Specified In Point 1.2, Includes In Particular:- Dismantling Of Existing Ceiling And Wall Lighting Lamps,- Removal Of Lamperia H = 2.00-4.00 M In All Rooms,- Resulting In Exfoliated Paint And Plaster On The Walls,- Disassembly Of Existing Internal Doors Together With Steel Frames,- Dismantling Existing Ventilation Boxes (Checking The Patency Of The Channels (Checking The Patency Ventilation, Connecting Rooms),- Torture Of The Frame Plaster (Maximum Widening Of The Door And Transition Openings),- Repair Of Existing Wall Plasters And Door And Windows, After Caring For Door Frames, Forging Glaze, Photo Of The Gk Housings,- Dismantling Of The Pvc Window, Planting Existing Holes,- Two-Windows Of Walls And Ceilings. After A Coat Of Washable Paints,- Making The Needed Gk Buildings On The Rei 120 Ceiling,- Cleaning The Floor,- Delivery And Installation Of New Interior Doors, Steel Ei60.4. The Detailed Scope Of Work And The Method Of Their Implementation Is Determined By The Design Documentation And Detailed Technical Specifications Of Construction And Acceptance Of Construction Works (Stwiorb), Constituting Annex 5 To The Specification Of The Contract Terms (Swz), Taking Into Account The Explanations And Changes Made By The Contracting Authority During The Public Procurement Procedure - If They Took Place5. The Contractors Remuneration Is A Lump Sum, Which Is The Equivalent Of The Contractors Benefit Described In The Design Documentation Indicated In Point 4 And In Stwiorb. 6. The Bill Of Quantities Is An Auxiliary, Which Means That In The Event That A Given Type Of Work Or Their Measurement Or Their Scope Was Included In The Design Documentation Or In Stwiorb - The Contractor Undertakes To Perform The Type Of Works Indicated There Or Their Measurement Or Their Scope In Accordance With The Design Documentation Or Stwiors As Part Of A Flat -Rate Remuneration, Even If A Given Type Of Work Or Their Measurement Was Not Included In The Previous Work. All Robots And Materials Delivered Will Be In Line With Design Documentation And Stwiorb. W Przypadku, Gdy Materiały Lub Roboty Nie Będą W Pełni Zgodne Z Dokumentacją Projektową Lub Stwiorb I Wpłynie To Na Niezadowalającą Jakość Robót Budowlanych, To T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.