1. The Subject Of The Order Is The Renovation Of The Workshop Room In The Building Of The Municipal And Communal Culture And Sport Center In Ogrodzieniec. 2. A Detailed Description Of The Subject Of The Contract Includes A Functional And Utility Program And A Bill Of Quantity-Annex 4 And 5 To Swz. 3. The Contractor Will Grant The Employer A Guarantee And Warranty For The Subject Of The Contract Of 36 Months From The Date Of Signing The Final Acceptance Report. 4. In Each Case Of Use In The Description Of The Subject Of The Contract Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, The Contractor Should Assume That Such As Accompanied By The Words Or Equivalent. 5. In The Case Of Use In Documents Of References To Standards, European Technical Assessments, Approval, Technical Specifications And Technical Reference Systems, The Employer Allows Equivalent Solutions Described. When Analyzing The Documentation, The Contractor Should Assume That Each Reference Used In The Documentation Is Accompanied By A Or Equivalent Word. 6. In The Event That Trademarks Have Been Used In The Documents, It Means That They Are Given, For Example And Specify Only The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Apply Equivalent Materials Or Devices, But With Technical And Quality Parameters Similar Or Better, The Use Of Which Will In No Way Negatively Affect The Proper Functioning Of The Solutions Adopted In The Documents. The Contractor Who Uses Devices Or Equivalent Will Be Obliged To Show During The Performance Of The Order That The Devices And Materials He Used Meet The Requirements Set By The Employer. 7. The Use Of Label In The Shared Documents Means That The Employer Accepts All Labels Confirming That The Details, Deliveries Or Services Meet The Equivalent Requirements Of The Labels Specified By The Employer. In The Event That The Contractor For Reasons Beyond His Beyond His Control Cannot Be Obtained By The Label Or Equivalent Label Specified By The Employer, The Contracting Authority, Within The Time Appointed By Himself, Accepts Other Relevant Evidence, In Particular The Technical Documentation Of The Manufacturer, If The Contractor Proves That The Construction Works, Deliveries Or Services To Be Performed By Him, Meet The Requirements Of A Specific Label Or Specific Requirements. Indicated By The Contracting Authority.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.