1 Niepodległości 53/55 For The Public Administration Building In The Design And Build In The Following Range: 1) Developing Complete Design Documentation Together With Obtaining All Necessary Opinions, Arrangements And Permits, Including Building Permits, I.E.:::) Development Of A Construction Project, Executive Projects, Safety And Health Protection Plan, Technical Specifications Of The Performance And Receipt Of Works And Other Studies Necessary For Obtaining Documents. Formal And Legal Necessary When Issuing A Building Permit Decision, Including The Design Documentation, B) Obtaining A Map For Design Purposes And All Required By Law Conditions, Opinions, Arrangements And Administrative Decisions Necessary For The Contractor On Behalf Of The Contracting Authority To The Competent Authority To Issue A Building Permit Decision Along With The Obtaining Of A Final Building Permit On Behalf Of The Contracting Authority, C) Authors Supervision By The Authors Of The Construction Project And Executive Projects During The Performance Of Works, 2) Execution Of Construction Works Based On The Developed Design Documentation, Consisting In The Reconstruction Of The Office Building Located In Olsztyn At Ul. Niepodległości 53/55 For The Needs Of The Warmian-Masurian Voivodship Office In Olsztyn Together With The Completion Of Accompanying Works, Including In Particular: A) Reconstruction Of The Functional System Of The Building, I.E.:-Reconstruction Of Toilet Rooms,-Separation Of Operator Rooms With Technological Floors,-Separation Of Conference Rooms And Training Rooms,-Separation Of Server Rooms And Coat Rooms Ups, - Releasing The Rooms Of The Cloakroom And Washroom, - Separation Of The Room Of The Fuel Control Warehouse, - Separation Of The Protection Room And The Cloakroom, - Separation Of Social Rooms, - Supply Installation Of A Spare Power Source - Power Generator, B) Building Thermo -Modernization, C) Changing The Method Of Heating The Building From The Oil Boiler From The Urban Network, D) Replacement Of A Passenger Crane With A Crane Available From Each Floor, E) Assembly Of The Platform For Disabled People Outside The Building, F) Implementation Of The Installation:-Water And Sewage With Connection,-Central Heating,-Electricity,-Structural Wiring,-Access Control,-Telephone And Telecommunications,-Burglary And Assault Signaling System, Monitoring, - Ventilation And Air Conditioning, G) Delivery And Permanent Foundation On The Roof Of The Antenna Mast Building Together With The Construction Of A Technical Shaft Through All Floors Of The Building For Installation Cables, H) Reconstruction Of A Free -Standing Garage Building, I) Implementation Of New Roads, Pavements And Development Of Green Areas Around The Building, J) Reconstruction Of The Fence Of The Property, 3) Necessary For The Contractor On Behalf Of The Contracting Authority To The Competent Authority To Obtain A Decision On The Permit To Use Along With Obtaining The Final Decision On The Use