1. The Subject Of The Order Is The Renovation Of The Building - For The Needs Of The Day Care Home For People With Disabilities, The Łysomice Commune, The Toruń Poviat, The Kuyavian -Pomeranian Voivodeship. 2. As Part Of The Work, It Is Expected, Among Others: 1) Disassembly Of The Door Joinery And Its Replacement; 2) Renovation And Painting Of Wall Finishing Layers; 3) Replacement Of Floors; 4) Replacement Of Suspended Ceilings; 5) Construction Of New Partition Walls; 6) Replacement Of Electrical Installation; 7) Reconstruction Of The Water And Sewage Installation Within Toilets; 8) Implementation Of A New Water-Water Installation In Pom. Washable, Kitchenette, Atrium Toilet; 9) Transfer/Disassembly Of Excess Radiators; 10) Transfer, If Necessary, Supply And Exhaust Elements Of Existing Mechanical Ventilation; 11) Bringing Central Heating To Newly Designed Rooms: Pom. Therapy, Pom. Rest, Pom. Residence Room; 12) Armament Of The Abovementioned Rooms In The Air Conditioning Installation; 13) Reconstruction Of Existing Toilets, With The Separation Of The Mens And Womens Toilet; 14) Separation Of Pom. Washing Room In The Existing Part Of The Kitchenette; 15) Alignment Of Floor Levels Between The Stay Room, And Vestibule And Pom. Economic; 16) Separation Of Full Walls, Atrium In Front Of The Toilet And Pom. Economic; 17) Thermal Insulation From Mineral Wool; 18) Insulation From Foil -Type Pair From The Rooms; 19) Protection Of The Installation Passages From The Boiler Room; 20) Painting The External Facade Of The Entire Facility; 21) Performing New Buildings Of Existing Ventilation Channels; 22) Reconstruction And Adaptation To The New Functional System, Existing Wardrobes And Kitchen Buildings In Pom. Kitchenette, Washable, Pom. Economic. 3. The Scope Of Works As Part Of The Established Remuneration Also Includes: 1) Preparing The General Schedule And Agreeing With The Employer And Supervision Inspector; 2) Analysis Of The Area Of Impact Of Works On Objects Adjacent To The Investment Together With The Development Of The Project To Secure These Facilities And The Method Of Monitoring Their Condition During The Performance Of Works; 3) Repair And Commissioning Of The Object; 4) The Contractor In Their Own Basis And On Their Own The Cost Undertakes To Organize And Arrange The Construction Facilities And The Construction Site Together With The Provision Of The Necessary Media And Their Metering To Perform The Subject Of The Contract; 5) Preparation, Organization, Securing And Cleaning Up After The Investment Of The Construction Facilities And The Construction Site; 6) After Completing The Works, But Before The Final Receipt Of The Work By The Contracting Authority, The Contractor Is Obliged To Organize The Construction Site Together With The Area What Was The Robot Before Starting; 7) Ensuring All The Media Necessary To Use The Investment; 8) Starting And Checking All Installations And Systems (Together With Checking Their Efficiency In Relation To De
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.