The Subject Of The Order Is To Carry Out Renovation Works Of 4 School Studios At The Technical School Complex In Malbork As Part Of The Project Entitled Improving The Quality Of Vocational Education In The Malbork Poviat: 1) Electrical Laboratory - Cabinet No. 8; 2) Laboratory Of Renewable Energy Equipment And Systems (Res) - Cabinet No. 6; 3) Mechanical Technology Laboration With Pacements - Cabinet No. 10; 4) Car Mechanics Laboratory - Cabinet No. 24. Claimed Works Are To Contribute To Renewal And Refreshing The Rooms Used Under Education. Professional, So That It Is Possible To Install And Arrange Equipment And Equipment Planned For Purchase Under The Project. The Planned Investment Will Not Change The Way The Area Is Used (It Is Carried Out In An Existing Building). No External Works Are Expected. The Undertaking Will Not Change The Method Of Land Development. Planned Works Do Not Require Obtaining A Decision On Environmental Conditions, As Well As Obtaining A Building Permit. Improving The Quality Of Vocational Education In The Malbork Poviat Under The European Funds Program For Pomerania 2021-2027, Priority 6. European Funds For Socially Strong Pomerania (Erdr), Actions 6.2. Infrastructure Of Inclusion And Vocational Education, Co -Financed From The European Regional Development Fund. Estate Positively Affects The Policy Of Non -Discrimination, Which Aims To Eliminate All Forms And Manifestations Of Discrimination, And Also Means Promoting Full And Equal Participation And Access In All Areas Of Life. The Solutions Used As Part Of The Project Are Fully In Line With The Principles Of Equality And Non -Discrimination In Accordance With The Provisions Of Art. 9 Of Regulation 2021/1060 And Guidelines Regarding The Implementation Of Equality Principles Under Eu Funds For 2021-2021. The Presence And Effects Of The Project Will Be Available On An Equal Time And In A Non-Discriminatory Manner For All Users. As Part Of The Project, Availability Standards For Cohesion Policy For 2021-2027 Will Be Used In Accordance With Annex 2 To The Abovementioned Guidelines In Designing The Scope Of Investment, The Recommendations Arising From Decisions For People With Various Special Needs, Including Dysfunctions, Were Taken Into Account. Project Products Will Be Useful For All Users. No Criteria Were Used In The Entire Design Process That Would Be Discriminatory. The Order Of The Contract Is Given In Full (Without Division Into Parts). The Detailed Description Of The Subject Of The Contract Is Included In Swz And Attachments.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.