1. The Subject Of The Order Is The Delivery Of A Prototype Supply System With Pcm. 2. As Part Of The Subject Of The Contract, The Contractor Will Develop Documentation And Build A Water Installation Working In A Closed System, Used To Generate And Receive Heat (Max. 95 ° C) With An Electrical Power Of A Heat Source Of Approx. 60 Kw, Equipped With A 800 -Liter Heat Buffer. The Installation Is To Be Installed On One, Carrier Loading Frame. 3. The Detailed Scope Of The Subject Of The Contract Is Contained In The Technical Specification Constituting Annex 3 To Swz Together With The Documents: • Technological Guidelines - Annex 3A To Swz, • Technological Scheme - Annex 3B To Swz, • Examples Of Apparatus - Annex No. 3C To Swz.4. The Contractor Will Be Obliged To Have Civil Liability Insurance In The Scope Of Conducted Business Activity Related To The Implementation Of The Subject Of The Contract, For An Amount Of Not Less Than Pln 300,000. 5. A Copy Of The Insurance Policy Together With The Inclusions Or Exclusions Of The Policy Scope Will Be An Attachment To The Contract With The Contractor. 6. The Costs Of Participation In The Procedure, And In Particular The Costs Of Preparing The Offer Are Covered By The Contractor. The Contracting Authority Does Not Provide For Reimbursement Of The Costs Of Participation In The Proceedings (Except For The Circumstances Referred To In Article 261 Of The Public Procurement Law). 7. Determination Of The Contract According To The Joint Order Dictionary (Cpv): 38540000-2 Machines And Research And Measuring Equipment, 71320000-7-Engineering Services In The Field Of Design. 8. The Length Of The Warranty Period Required By The Employer Is A Minimum Of 12 Months From The Incorrect Acceptance Of The Subject Of The Contract. 9. Equivalence: 9.1. The Contracting Authority Has Made Due Diligence So That The Subject Of The Contract Is Not Described By Indicating Trademarks, Patents Or Origin, Source Or A Special Process That Could Lead To Privilege Or Eliminating Some Contractors Or Products. If, Despite This, It Turns Out That In Any Place Swz And The Attachments There Are Such Indications, They Should Not Be Treated As Requirements Related To The Subject Of The Contract, And They Should Be Considered Only In Terms Of Information Indications (Not Binding For Contractors) And Such Cases Of Own Names With Unambiguous Information That The Device Is Only Examples. 9.2. Wherever In The Technical Specification, Technical Documentation, And In Other Documents, The Employer Referred To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, And Such References Were Not Accompanied By The Or Equivalent Expression, The Contracting Authority Allows Equivalent Solutions Described In Each Such Norm, European Technical Assessment, Approval, Technical Specifications, And Technical Reference System. In Connection With The Abov
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.