Conveyors - Application Request: Haapajärvi: Latama Development Procurement. The Logistics Department Of The Defense Forces (Hereinafter Referred To As The Contracting Entity) Requests An Application For Participation In Haapajärvis Production Development For The Defense Forces In Accordance With This Request For Participation And Its Annexes. Procurement: The Design And Development Site In Haapajärvi, An Explosive Center In Haapajärvi, Are The Main Tasks: The Contracting Unit Wants To Develop Production Through Automation And Robotics. Goals Are Minimizing The Number Of People. The Candidate Must Indicate The Number Of Persons Required By The Reported Capacity, Ie How Many Must Be Used By The Device In Question. The Contracting Entity Has Chosen The Subject Of Automation: The Replay Of The Current Conveyor, Including The Automation Of The Current Lab (Includes Cleaning And Inspection Of The Thread, Attaching/Installing The Spacer, And Loading The Above Conveyor), Automation Of The Current Hollow Core. The Supplier Chosen By The Contracting Unit Will Install All The Machines And Equipment Mentioned Above In Explosive Areas (Ip54 T4). Removal Of Recurrent Non -Ergonomic Work Steps: The Following Tasks And Services Below Are The Responsibility Of The Supplier To Be Selected. The Acquisition Also Includes Outdated Technology, Installing New Technology, All The Necessary Design And Procurement Documents As A Complete Delivery. The Supplier To Be Selected Must Design All Possible Operations To Be Automated And Automatically Functional. The Selected Supplier Must Also Design The Machines And Equipment To Work Independently. The Modernized Line Must Meet/Meet The Ergonomics Requirements And Capacity Needs 81 Vrtkr, 120 Cprtr And 155 Tkr Products. Products With Different Versions And These Different Versions Can Be Found In The Drawings To Be Delivered Separately. Delivery Main Tasks Listed: 1) Implementation Capacity According To Requirements, As Well As Minimizing The Number Of Persons 2) The Current Below The Current Conveyor, Including The Dismantling Of The Current Useless Proportion, The Necessary Design, The Preparation, The New Installations 3) Current Lab Loading) Automation Of Operations, New Installations, Dismantling The Current Proportion, With The Necessary Design 4) Automation Of Current Cavity, With The Necessary Design, New Installation, New Installation. 5) Automation Of The Current Weighing Function, With The Necessary Design, Unloading The Current Part, New Installations. The Aim Is To Implement The Procurement (Including The Planning Of Procurement) During 2025-2026, So That The Installation Time Of The New Technology Would Be As Follows: Working Time Is Possible At 20.07.2026 - 18.10.2026 (Weeks 30-42). T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.