The Scope Of The Task Is To Improve Thermomodernization Along With The Construction Of Installations Using Renewable Energy Sources In The Building Of The Primary School In Przyłęk. The Order Of The Order Includes A Comprehensive Design, Delivery Of Necessary Materials And Equipment And The Implementation Of Construction Works, In Accordance With The Functional And Utility Program, In The Scope Of:- Thermomodernization, Which Includes Works Related To Insulation Of Selected Walls And Ceiling And Replacement Of Windows And External Doors,- Mounting The Cascade Of Air Heat Pumps For Central Heating Purposes. With A Power Of Min. 155.2 Kw,- Air Heat Installation Air-Air For The Purposes Of Heating A Gym With A Total Power Of Internal Units Min. 42 Kw,- Air-Water Heat Pump Installation For Hot Water Purposes With A Power Of Min. 14.6 Kw,- Implementation Of The Central Heating Installation Radiator, -A Photovoltaic Installation With A Power Of Min. 29.93 Kwp With Energy Storage Min. 10 Kwh, Lighting Modernization. The Said Order Was Provided In The Design And Build Mode And Includes: • Implementation Of Project Documentation With All The Required Agreements, • Implementation Of The Necessary Construction And Assembly Works, • Conducting Instruction For The Facility Indicated By The Contracting Authority In The Field Of Installation Service. Agreed With The Employer). Projects Should Be Made In Accordance With: • Requirements For The Specification Of The Terms Of The Contract (Swz), • Functional And Utility Program (Pfu), • Arrangements With The Supervision Inspector. The Resource Is The Preliminary Inventory Of The Object Specifying The Type Of Building, Plots, Proposed Locations Of Renewable Energy Installations. It Is Noted That Each Of The Contractors Applying For The Order Can Make A Local Vision On Their Own And Verify The Provided Information. Any Interested Contractor Will Receive The Opportunity To Freely Make A Local Vision And Measure Of The Building, Rooms And Installations - Within The Time Limit Set By The Ordering Party In Swz - As Well As Insight Into The Existing Documentation. The Commissioner Suggests Taking A Local Vision To Verify The Information Made Available And All The Conditions Not Described In This Study. In Order To Prepare The Installation Design Documentation, All Necessary And Required Inventories And Arrangements Should Be Made.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.