Tenders Are Invited For Zp/06/2025 - Construction Of A Multi -Family Residential Building Together With The Necessary Technical Infrastructure And Land Development In Wolsztyn
Tenders Are Invited For Zp/06/2025 - Construction Of A Multi -Family Residential Building Together With The Necessary Technical Infrastructure And Land Development In Wolsztyn
1. The Subject Of The Contract Is The Implementation Of Comprehensive Multi -Branch Design Documentation And The Construction Of A Multi -Friendly Multi -Family Residential Building Together With The Necessary Technical Infrastructure And Development Of The Adjacent Area. The Investment Is Planned For Implementation In Wolsztyn, At Ul. Słoneczna 4G, On The Plots Of Plots No. Revis. 312/11, 311/3, 311/6, Wolsztyn Poviat, Greater Poland Voivodeship. The Investment Area Is Surrounded By The Historical Urban Plan And Construction Team Of The City Of Wolsztyn, Entered In The Register Of Monuments. 2. The Subject Of The Contract Includes In Particular: 1) The Implementation Of Comprehensive Multi-Branch Design Documentation, Including The Development Of A Multi-Branch Technical Project To The Extent In Accordance With The Provisions Of The Development Of The Minister Of Development Of 11 September 2020 On The Detailed Scope And Form Of The Construction Project (Journal Of Laws 2012.1679), 2) Obtaining All Required Opinions, Arrangements And Permits Necessary To Implement The Construction Intent, 3)) Making An Effective Notification Of The Completion Of Construction Works And Obtaining Permits For Use, Including The Implementation Of The Energy Characteristics Of Individual Residential Premises. Annex To Pfu. In Terms Of Thickness Of Building, The Quantities Given In Pfu Should Be Adopted As Superior To Design In The Technical Design. B) A Multi-Family Residential Building Is Planned As A Four-Storey, Non-Sub-Supported, With A Flat Roof With An Attic Wall. The Entire Structure Of The Building In Prefabricated, Large-Panel Technology With All Walls Of Keram-Zitobetone. A One Staircase Was Designed In The Building, Equipped With A Man-On Passenger Crane. On The Ground Floor Of The Building, Two Apartments Are Designed To Take Into Account The Needs Of People With Disabilities. Intended.E) To The Building, All Necessary Technical Connections And Installations, Including Water Supply, Sewage, Rain, Electricity, From-Grom And Teletechnical Installations Should Be Built Into The Building. For The Collection Of Rainwater, A Sealed Underground Or Other Equivalent Tank Is Planned. On April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (Journal Of Laws 20122.0.1225), And Correspond To Separate Regulations, Including Fire Protection, Etc. 3. A Detailed Description Of The Subject Of The Contract And The Manner Of Processing The Order Is Determined By: Functional And Utility Program (Hereinafter: Pfu), Building Permit With A Construction Design, Opinions, Arrangements, Connection Conditions Constituting Annex 4 To Swz, Designed Contract Provisions Constituting Annex No. 5 To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.