GTR 98228617
Tenders Are Invited For Construction Work For Water And Sewage Pipelines - Construction Of The Cooling Water Pipe Scheldelaan Ova1b
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
98228617
Tendering Authority
Subscribe to view
Tender No
400248-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work For Water And Sewage Pipelines - Construction Of The Cooling Water Pipe Scheldelaan Ova1b
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
07-08-2025
Closed
Work Detail
Construction Work For Water And Sewage Pipelines - Construction Of The Cooling Water Pipe Scheldelaan Ova1b. With The Waterkracht Project, Water-Link Wishes To Offer A New Water-Grade, From An Alternative Source, To Industrial Customers. The Project Mainly Starts From Purified Wwtp Water. The Waterkracht Project Includes 2 Phases: Phase 1: - Construction Of Cooling Water Factory - Construction Of Piping Infrastructure Cooling Water Part Right Bank - Construction Tap Infrastructure Effluent Phase 2: - Build Expansion Cooling Water Factory - Construction Of Pipeline Infrastructure Part Left Bank Will Be Laid Out With Gre Pipes (Glass Reinforced Epoxy). This File Includes The Following Parts: - The Cooling Water Pipe (With Varying Diameter Between Dn300 And Dn700), Which Is Laid In Gre (Fiber Optic -Reinforced Epoxy). The Pipe Is Partly Laid Out In Open Slot And Partly Through The Pall Tunnel. The Cooling Water Pipe Is Laid From The Liefkenshoek Tunnel To Exxon (See Figure 1) Over A Length Of Approximately 7.8 Kilometers In The Public Domain And Through The Pall Tunnel. To The North Of The Pall Tunnel, The Pipe Is Largely In The Parking Lane Of The Scheldelaan On The Company Side. There Is Twice A Phased Cut -Through Of The Scheldelaan In This Zone In Open Slot. To The South Of The Pall Tunnel, The Management Is Largely On The Site Of Induss I And In The Right-Hand Lane Of The Scheldelaan On The Company Side. There Is Also A Phased Cut -Through Of The Scheldelaan For Open Trench. The Management Through The Pall Tunnel Will Still Have To Be Designed By The Tenderer. Designing, Calculating And Delivering The Necessary Supports In The Tunnel (Incl. Vertical Shafts) Are Included In The Tenderers Assignment. The Delivery Of The Gre Leadership Is Not Included In This Assignment. Figure 1: Cooling Water Pipe - The Delivery And Construction Of A Microtube Along The Route In The Same Slot, Mantle Tube Or Tunnel As The Cooling Water Pipe. The Start Of The Works Is, At The Time Of Layout Of The Selection Guideline, Provided In May 2026. The Publication Of The Specifications Is, At The End Of August 2025 At The Time Of Drawing Up The Selection Guideline.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6e75af40-a7bc-442c-b090-99472a65ba19.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.