Operation Of Water Supplies - Cooling Guarantee, Local Spot. At Low Water Levels. The Contracting Authority Intends To Conclude A Framework Agreement To Perform The Tasks Detailed Below. The Contracting Authority Looks At At Least 24 Hours Of Pumping (Up To 30 Calendar Days) And At Least 20 Days Of Dewatering On 4 Floating Units (Up To 30 Calendar Days) On The Amount Of Orders To Be Completed At The Same Time. Capacity Diesel Pump). The Contracting Authority Orders A Pumping Exercise During The Contract Term For Operational Safety. The Pumping Exercise Of At Least 24 Hours Should Be Performed From 4 Swimmers, 16 Diesel Pumps At Least 0.2 M3/S Each, With Water Lifting At Least 2 M High. The Nuclear Power Plants Safety Cooling Water System, 83.5 Mbf Of Cold Water Drainage Water Level, Should Be Provided With Diesel Pumps Installed On The Water Surface Of The Cold Water Channel. The Nuclear Power Plant Block Requires A Minimum Of 4X0.6 M3/Sec And Properly Filtered Water. This Amount Of Water Is Provided By A Total Of 16 (12 Db + 4 Spares) Mounted By The Tenderer Using A Total Diesel Pump Of 0.2 M3/Sec Each. The Tenderer Draws 4 Floating Plants Installed On The Water Surface Of The Cold Water Sewer Bay Into The Space Between The Entry Sluices Of The Safety Cooling Water Systems And The Ribbon Filters. The Tenderer Submits The Assembled Pumps As A 4 -Hour Load Test Each. The Cooling Water Supply In This Way Should Be Continuous, As Long As It Is Required By Nuclear Technology Or As Long As The Bay Water Level Is Decided To Stop Diesel -Powered Pumps. Protection Of Water Pollution Damage Caused By A Possible Failure Of Pumps Installed On The Pumping Task Should Be Ensured By Installing And Using Devices For This Purpose. • Details Of The Task (Public Procurement Technical Description (Kml) 2-5): • After The Customer Has Been Written, Max. During 5 Calendar Days, A Parade (4 Complete Floating Units Must Be Pumped) Into The Cold Water Sewerage (P. • The Assembly And Moving (60-100 M2 Of Diesel Pump Floating Unit (60-100 M2 - Which Can Be Placed And Operated With A Dive Depth Of Up To 80 Cm) (Flood Table Operation Point). • The 4 -Hour Load Test Of Each Of The 18 Diesel Pumps, Each In The Heavy Harbor (The Operating Point Of Operation). • Keeping The Assembled Technique In The Heavy Harbor For Up To 60 Days (The Standby Point Of The Flood Table). • Based
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.