Technical Planning Services-Őrbottyán-New 24 Classroom Planning. According To The Design Contract, For A New 24 Classroom School, Generation Planning Tasks (Preparation Of Licensing And Export Design Documentation On The Basis Of The Approval Design Documentation, Obtaining The Necessary Permits) And The Optional Design Tasks (Contribution To The Execution Process (S); For A Topographical Number Of Real Estate. The Tenderers Of The Contracting Authority Are Made Available To The Tenderer. A More Economical Feasibility Shall Be Made When Processing The Approval Plan And Preparing The Licensing And Export Plans; Even By Rationalization, Optimizing The Areas, And Choosing Structures That Can Be Economically Implemented. Designing A New School Building With 24 Classrooms, 8 Group Rooms, 7 Specialty Classrooms, 2 Individual Development Rooms, And 3 -Part Gym Sports Floor, Gym Room, Library, 1.200 Serving Kitchen, 160 -Person Dining Room And Representative Lobby. The Building Has A Total Net Area Of 8,995 M2 At The Ground Floor And 1St Floor Levels, Of Which Classroom And/Or Specialist Class And/Or Language Lab And/Or Lecture Hall And/Or Lab Rooms And/Or Library Rooms Have A Total Area Of 2 170.86 M2. Total Size Of Gym And Gym Room: 1 203.43 M2. Planning Subject And Volume, Technical Parameters: Building: Cellar Level Net Floor Space: 2 719 M2 Ground Floor Net Floor Area: 3 322 M2 Floor Floor Space: 2 690 M2 Attic Engineering Net Floor Space: 264 M2 Summary Net Floor Space: 8 995 M2 Full Receipt: 720 Students, 60 Courtes: 545 M2 Sports Yard: Approx. 2 400 M2 Sports Field: 968 M2 Playground, Tanker: Approx. 3 600 M2 Public Parking Space: Within 31 Plots, 38 Pieces On The Plot Of 1292/5 Hrsz: Approx. 3 000 M2 Of The Building ± 0.00 Levels +198.00 Mbf. The School Can Be Divided Into Well -Divided Parts, So That The Educational Function And The Sports Function Can Be Well Distinguished And Operated Separately. There Are 3 Entrances To The Building: The Main Entrance And The Entrance To The Sports Areas From The Planned Public Space, While The Economic Entrance Can Be Accessed From The Parking Lots At The Back. Its Weight Is 2 Levels High, High -Roofed Building With A Prey. The Educational Function Unit Is Made Up Of Two Horizontally Displaced, Roughly The Same Size, High -Roofed, Partly Flat -Roofed, Interior. The Cellar Level Has A Gym, Changing Rooms And Service Rooms, While On The Ground Floor And Upstairs There Are Rooms Belonging To The Educational Function. Structure: Foundation Of The Building Parts Of The Building And Point Foundation. Ironed Soles Are Made On Top Of The Base Bodies. The Building Vb. Pillar -Skeleton, World Championship. With Stiffening Walls And 30 Cm Vtg. Frame Ceramic With Filling Walls. The Slab Structure Is Monolithic Vb. Or
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.