Part 1 Installation Of The Ground Heat Pump And Reconstruction Of The Central Heating Installation In The Building Of The Primary School Father Pr. St. Gawlik In Radziechów 1. General Information - Installation Of A Cascade Of Three Ground Heat Pumps With A Total Capacity Of 192 Kw (3X64 Kw), Including: A) Dismantling Of The Armaments Of The Carbon Boiler Room With Utilization, Preparation Of The Boiler Room For Installation For Installation Despite Heat Together With Necessary Robots And Accompanying Materials. Existing Central Heating Network, Necessary Reconstruction Of The Central Heating Installation In Order To Adapt It To Cooperation With The New Heat Source, Connect To The Lower Power Source, Automation, Necessary Tests, Launch, Training And Performing As -Built Documentation. With A Capacity Of 700 Liters With Connection Together With The Necessary Robots And Accompanying Materials. Therefore, The Scope Of The Order Does Not Include The Construction Of Drilling Holes. 2. The Heat Pump Regarding The Implementation Of A Heat Mistake Provides A Functional And Utility Program. The Scope Of The Order Includes The Inventory Of The Actual Technical Condition Of The Domestic Room And Installation+Hot Water. In The Facility In Which Ground Heat Pumps Are To Be Installed, As At The Date Of The Installation Assembly. As Part Of The Subject Of The Contract In The Scope Of Technical Development Of Executive Documentation, The Contractor Will Draw Up A Complete Technical And Conclusion Design Including: • Description Of The Heat Source Together With The Selection Of Basic Devices, • Diaphragm Expansion Vessels Or Stabilization Of The Installation Pressure • Safety Valves • Technological Scheme Together With The Technical Specification Of Devices, • Project To Connect The Cascade Of Heat Pump Pump Cascades; The Design Must Take Into Account The Installation Parameters Of The Building- Power Temperature Of 65 ° C, • Design Of Heat Pump Connecting To The Installation Of Dhw • Selection Of Cable And Overcurrent Protection, • Catalog Cards And Certificates Of Admission To The Use Of The Components Used, • Certificates Confirming The Contractors Rights To Install Renewable Energy Systems In The Field Of Heat Pumps. Approval To The Ordering Party. As Part Of Construction And Installation Works, It Is Necessary To: • Make The Necessary Installation Works Aimed At Using A Ground Heat Exchanger As A Heat Source For Cascades Of Ground Heat Pumps, • Provide Waterproof Culverts On Power Supply And Return • Execution Of The Partitions (Foundations, Ceilings, Walls) For Cables And Their Protection, • Disclosure Of Condensation In Accordance With Manufacturer, • Sealing Of Culverts In Places Of Pipelines, • Comprehensive Modernization Of The Boiler Room And Connection To The Installation According To Project, • Start And Start Of Heat Pump Installations, • Conducting To The Necessary Extent Of Operating Tests, Pressure And Settings Of The Regulator, • Training Of Use
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.