Tenders Are Invited For Modernization Of The Fire Signaling System In The Design System And Build At The Correctional Facility In Grodzisk Wielkopolski
Tenders Are Invited For Modernization Of The Fire Signaling System In The Design System And Build At The Correctional Facility In Grodzisk Wielkopolski
1. The Subject Of The Contract Is The Comprehensive Modernization Of The Fire Signaling System (Ssp) In The Building Of The Correctional Plant In Grodzisk Wielkopolski At Ul. Bukowska 18 Along With Accompanying Works. The Order Will Be Implemented In The Design And Build System And Consists Of Two Parts: A) Development Of Project Documentation, B) Execution Of Construction Works On The Basis Of Developed Project Documentation. The Order Of The Contract Includes All Works Falling Within The Scope Of The Construction Process, From The Implementation Of The Project Documentation, Through The Implementation Of Construction Works, For The Performance Of The Astopal Documentation, Including: Construction Inventory For Design Purposes, Necessary Analyzes, Concepts And Expertise; • Development And Performance In Accordance With Applicable Regulations And Standards Of Project Documentation In Consultation With Fire Protection Appraiser. (Concept, Executive Design And As -Built Documentation); • Obtaining A Building Permit Or Notification Of Works That Do Not Require A Building Permit - If Concerned; • Dismantling And Utilization Of Old Ssp Devices; • Execution Based On An Executive Design Prepared By The Contractor And Accepted By The Ordering Party Of A New System Protecting The Object; • Delivery, Installation And Programming Of The Ssp Headquarters; • Delivery And Installation Of New Manual Firewriters And Devices Initiating Information About The Fire Of The Fire Control Panel; • Delivery And Installation Of New Control And Control Modules; • Execution Of Measurements Confirming The Possibility Of Using Existing Cabling; • Installation Of A New Wiring, Where It Is Not Possible To Use The Existing One; • Restoration Of Rooms To The Previous State; • Integrating Ssp Installations With Existing Systems Related To Fire Protection And Other Security Systems; • Testing The System For Correct Operation; • Handing Over To The Contracting Authority Of All Licenses, Keys, Passwords For Installed Software And Ssp Central; • Training Employees Of The Employer In The Field Of Service And Operation Of The New Ssp. The Information Provided In The Functional And Use Program Does Not Release Bidders (Contractors) From The Need To Conduct A Local Vision In The Field And Take Into Account Other Not Described Conditions. The Project Will Be Supplemented By The Contractor With The Necessary Architectural Inventories Taking Into Account The Location Of The Installation In The Area Indicated By The Employer. The Design Development Should Include The Entire Scope Of The Task. The Design Documentation Should Be Complete From The Point Of View Of The Purpose To Which The Provisions Of The Construction Law, Technical And Construction Provisions, Related Provisions And Norms. The Timetable Scope Of Work, Provided For Performing As Part Of The Contractors Obligations, Is Presented. Technical Ones Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law Act
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.