1. The Subject Of The Order Is The Construction Of A Multifunctional Field At Primary School No. 22 In Kielce, At Ul. Gagarina 3 Together With The Execution Of Building And Assembly Works And The Necessary Technical Infrastructure, As Well As, The Development Of The Area, Located On Plot No. 8 Of The 0024 In Kielce. 2. The Subject Of The Contract Includes In Particular: 2.1. Construction Of A Multifunctional Pitch Containing The Function Of A Handball Field, Basketball Courts; 2.2. Construction Of A Volleyball Court, 2.3. Construction Of A 60 M Sprint Treadmill (With A Minimum Number Of 2 Tracks) And A Long -Term Hill With Polyurethane Surface, 2.4. Installation Of Outdoor Devices - Street Workout, 2.5. Equipment Of Fields (Gates, Baskets, Nets, Etc.), 2.6. Performing Footballs, 2.7. Disassembly And Utilization Of The Existing Surface Of The Pitch, If Necessary To Remove It, 2.8. Pitch Lighting, 2.9. Digital Monitoring Within The Designed Objects, 2.10. System Of External Zone Sound System Within The Designed Objects, 2.11. Drainage Of The Fields, 2.12. Reconstruction / Construction Of External Installations, Connections Necessary To Operate Pitches, 2.13. Construction Of Communication Routes For The Needs Of Designed Fields, Including Sidewalks And A Band Around The Fields And Accompanying Facilities And The Reconstruction Of Existing Communication Routes Around The School Building, 2.14. Cleatching Trees And Shrubs In The Event Of A Collision With Designed Objects, 2.15. Execution Of Land Development As Part Of The Designed Facilities Taking Into Account, Among Others Small Architecture (Including Benches Without Backs, Garbage Bins, Information Boards With Regulations, Bicycle Racks), Land Alignment With A Lawn Device, 2.16. Delivery And Installation Of An Information Board With Regulations (Height Approx. 200 Cm, Width Approx. 62 Cm, Board Measuring About 50X90 Cm). 3. The Detailed Scope And Manner Of The Contract Are Determined By: 3.1. Design Documentation, I.E. A Construction And Executive Design Prepared By The Design Unit: Ebe Studio, Architectural Studio Edyta Banachowska, Constituting Annex 2 To Swz; 3.2. Technical Specifications For The Execution And Acceptance Of Construction Works - Constituting Annex 3 To Swz; 3.3. Contract Template - Constituting Annex 4 To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.