1 Lubańska 9A In Zgorzelec. 2. The Scope Of Activities Includes In Particular Reviews And Maintenance: Air Conditioning Systems, Power Generator, External Lighting Of The Hall Along With Its Systematic Supplementation, Trafo Station, Hydrophore, Ventilation Units And Camera Monitoring. 3. In Order To Ensure The Proper Functioning Of The Facility, The Contractor Is Obliged To Perform Systematic Inspections, At Least Once A Month, All Components Of Equipment And Installation Equipment. I.E. Technical Installations, Which Include: Water And Sewage Installations, Hydrophore, Ventilation And Air Conditioning Installations As Well As Electrical And Power Installations As Well As Devices Listed In The Monthly Protocol On The Performance Of The Technical Service, Periodic Inspections And Maintenance Of Devices And Installations, Constituting Annex 3 To The Draft Contract. 4. As Part Of The Technical Service Consisting In Service And Maintenance As Well As Reviews Of Equipment And Installations, The Contractor Includes: 1) In The Scope Of Ventilation And Air Conditioning Installation: A) Conducting Technical Service And Maintenance Of Ventilation Installations Through, Among Others Replacement Of Used Filters With New In Ventilation Units, B) Conducting Service Activities Consisting Of Ongoing Operation And Maintenance Of Air Conditioning Installation Through, Among Others Replacement Of Used Filters With New In Air -Conditioning Units, Checking The Condition Of The Exchanger Dirt, C) Conducting Periodic Reviews Of Devices (Humidifiers, Fans, Heaters, Flow Regulators) - According To Manufacturers Recommendations, D) Conducting Periodic Service Activities Consisting In: - Checking Whether The System Is Properly Vent - Checking Whether The Installation Is Tight, - Checking The Condition Of The Electrical Installation Cables Of The Equipment, - Cleaning The Filters And Settlers, - Starting The Installation And Conducting Tests Of Their Refrigeration Parameters, - Checking The Opening And Closing Of All Valves. 2) In The Scope Of Ice Water Installation, Which Is Adapted To Automatic Operation - Exercising Inspection And Regular Installation Conservation To Ensure Readiness For Work For Work Through: A) Checking Whether The System Is Properly Veneered, B) Checking Whether The Pressure/Water Level In The Installation Is Appropriate, C) Checking Whether The Installation Is Tight, D) Cleaning Of Filters And Settlers, E) Starting The Installation, F) Check Whether They Do Not Occur In The Room In The Room Insufficiently Cooled And, If Necessary, Adjusting The Flow In The Installation, G) Checking The Heat Insulation, H) Checking The Heat Insulation. And Closing All Valves. 3) In The Scope Of Electrical Installations: A) Conducting Periodic Inspection By: - Checking The Technical Condition Of Individual Components Of Power Supply And Receiving Installations In The Hall Building, - Determining The Size Of The Consumption Or Damage And The Indicative Cost Of Their
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.