1. The Subject Of The Contract Is The Implementation Of Comprehensive Design Documentation: 1) Street Construction And Drainage With A Total Length Of About 1879 Mb: Karmelowa Street Around 597 Mb (Road 20 Kdd And 33Kx), Roads 21 Kdd Around 125Mb Together With The Necessary Technical Infrastructure, I.E. Construction Of A Water Supply, Sanitary Sewage System, Street Lighting, Street Lighting, Street Lighting, Street Lighting, Street Lighting, Street Lighting, Street Lighting, Street Lighting. Localna Street Around 215Mb (Road 22Kdd), Familijna Street Around 240Mb (Road 23 Kdd), Zacisze Street Around 302Mb (Road 27 Kdd And 30Kdd), Street Szafirowa Street Around 290Mb (28 Kdd And 31Kdd), Sesame Street Around 110Mb (29 Kdd) 2) Two Tanks For Retention Water As Part Of The Task Entitled: Construction Of Roads Together With Dehydration In The Piaskowa Estate. As Part Of The Implementation Of The Subject Of The Contract, The Contractor Will Be Obliged To Perform: 1) A Construction Project For All Industries, Including: A) Road Industry Together With Elements Of Small Architecture, The Project Should Contain A Traffic Organization Plan For Construction And Permanent Traffic Organization, B) Electrical Industry, C) Sanitary Industry In The Field Of: Rain, Construction Of Sanitary Sewage System, Road Dehydration, Project Of Building A Water Supply Network Along With Complementing The Missing Water Supply Connections In The Road Lane And Water Supply Nodes (Valves And Hydrants P.), D) Removal Of Necessary Collisions (In The Event Of Their Occurrence), E) Preparing Materials For The Application For A Dismissal From The Provisions Technical And Construction If It Is Necessary To Locate Under The Road Lane Or Devices Not Related To The Road, If Necessary, 2) An Executive Project For All Industries Described, As Well As An Executive Project To Remove The Necessary Collisions In The Event Of Their Occurrence, 3) An Investor Cost Estimate For All Industries (In The Price Take Into Account One Overcoming Cost Estimates At The Request Of The Ordering Party), 4) For All. Industries, 5) Collective Cost List, 6) Technical Specification Of Construction And Acceptance Of Construction Works For All Industries, 7) The Greenery Project Together With Its Inventory (In The Case Of Planned Cutting Of Trees And Shrubs Due To Collisions With Their Above -Ground And Underground Parts, The Implementation Of The Greenery Design Also Including The Cutting Of Trees And Shrubs With Investment, Along With The Ornithological Opinion, And The Project And The Project Compensatory Plantings), 8) Soil Research And Geotechnical Documentation, 9) Temporary And Permanent Traffic Organization. 2. The Subject Of The Contract Was Described In Detail In Swz Part Ii (Opz). The Removal Cannot Be Divided Into Parts, As It Is A Technical Whole.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.