GTR 98035573
Tenders Are Invited For Pipeline, Piping, Pipes, Casing, Tubing And Related Items - Ww 8004 - Leidingen -Dillingen, Delivery Of Pipe Material
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
98035573
Tendering Authority
Subscribe to view
Tender No
386006-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Pipeline, Piping, Pipes, Casing, Tubing And Related Items - Ww 8004 - Leidingen -Dillingen, Delivery Of Pipe Material
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
16-07-2025
Closed
Work Detail
Pipeline, Piping, Pipes, Casing, Tubing And Related Items - Ww 8004 - Leidingen -Dillingen, Delivery Of Pipe Material. Creos Deutschland Gmbh Is The Owner And Operator Of An Approximately 1,700 Km Long Gas High Pressure Line Network. The Management Network Serves The Public Gas Supply In The Area Of The Saarland And In Large Parts Of Rhineland-Palatinate. To Ensure Long -Term Ensuring The Performance Of The Regions Needs -Based Care, An Investment Program For The Future -Oriented Orientation Of The Gas High Pressure Network Was Developed. Since August 2020, The Saarland Has Officially Been Able To Describe Itself As A Hyexpert Hydrogen Model Region. The Heart Of The Model Region Are Various Projects That, In Conjunction, Represent The Concept For The Future Use Of Hydrogen In Saarland, In Particular The Cross -Border Infrastructure Project Mosahyc. The Basic Goal Of The Mosahyc Project, Together With A French Gas Network Operator, Is To Create An Approximately 90 -Kilometer -Long Cross -Border Hydrogen Network. The Establishment Of The Mosahyc Line Network Is To Be Built Up In The Region, First Hydrogen Production Capacities Are To Be Converted To Hydrogen In The Regional Steel Industry And Significant Co2 Savings Are Achieved By The Use Of Green Hydrogen. A Component Of The Mosahyc Line Network Is The Construction Of A New Hydrogen Line (Dn 600, Dp 70 Hydrogen) Between Leidingen And Dillingen (Approx. 16 Km Total Length), Which Is Intended To Connect The Steel Mill In Dillingen To The Existing Carling-Perl Pipeline. According To The Current Schedule, The Planning Approval Decision Is Expected Until 05/2026 And The Start Of Construction In Mid -2026 Is Sought. The Client Is The Project Company Creos Deutschland Hydrogen Gmbh Founded For This. The Order Of The Order Is The Procurement (Delivery And Acquisition) Of The Pipe Material (Dn 600) Required For The Construction Project As A Material Endurance Of The Client For The Pipe And Civil Engineering Company Commissioned By The Construction Of The Pipeline. Delivery Is Staggered In Three Separate Order Calls In The Period June 2026 To April 2027 Free Construction Site On The Storage And Pipe Construction Companies Named By The Client Along The Pipeline Route Or Other Destinations Defined By The Client. The Contractor Also Owes The Entire Delivery Logistics And The Unloading Of The Pipe Material And Is Responsible For The Safe Storage Of The Pipe Material In Accordance With The Manufacturers Requirements. Insofar As There Should Be Delays, The Intermediate Storage Of Pre -Produced Pipe Material Is Provided By The Contractor To Delivery.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b5dca6c3-c4ec-4180-8d6e-86fe25ab36b1.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.