The Project Includes The Installation Of 5 Points Of Cameras Each Endowed With 1 High -Resolution Ptz (4Mp) With 2 Fixed 4Mp Ip Bullet Chambers, With Speakers, Configuring A Total Of 15 Cameras In Total Connected To The Monitoring Center Equipped With 6 Monitor 43 ”Fhd, 2 Video Support 5G Auto Transmitter (Ap), Joystick Controllers, Joystick Controllers. Ups Line Interactive, Dv Host - 4Tb. Galvanized 12 Meters With Lightning System And Two Metal Structural Boxes The First Smart Starlight Lens, Which Allows A Deep Approach Even In Extreme Darkness, These Unified Technological Materials Allow The Television Camera Surveillance To Have A 10 -Day And 6 Hours Of Energy Autonomy Recording System Approximately In The Case Of Light Cuts.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.