Folding The Stacks Of The Bridges In The Formation Of The Pupils: From The Wrinkle, Adding Or Exiting Or Exit To The Norm Of 27-06-020-3 When The Cover Is 0.5 Cm Change 0.5 Cm (4 Cm), Construction Of A Thickly Large-Grained Eu-Grain-Grain-Boiling Boiling Thickness Of 4 Cm Thick Covering, Density Of Stone Materials: 2.5-2.9 T / M3 (In The Bridge), Six Basic Bases Of The Foundation: Gravel (Under The Edge), Building Six Bases Of The Foundation: Sandy (Under The Edge), Construction Of Six Bases: Gravel (Bottom), Six Basics Of The Foundation: Sandy (Bottom), Vertical Concrete Surface Painting Insulation: 2 Fold, Diluted Bitumen (Edge Supports), Potting Parts Of Boiled Buildings, Establishment Of Support Parts From Polymer Materials, Rubber And Ftoroplast Of Bridged Buildings (Roch 40X40x5 Cm), Establishment Of Pipe And Bridge Supports In The Monolithic Foundations, Establishing Deformation Seams (Wd80 2 Units) With Lenvari Rubber Composers And Metal Border, Coloring Metal Surfaces With Oil Paint: Steel Tires, Diameter 50 Mm And More Than 50 Mm And More Pipes, Coloring Number 2 Times (Rugs), Construction Of Steel Railings Welded On Bridges And Road Transmissions, Withdrawal Of Steel Water Pipelines, Hydraulic Testing, Diameter Of The Pipes: 75 Mm (D = 76X4 Mm)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.