Flooring And Impregnating The Bituminum Of The Bitumen Of Pieces Of Wrinkle Covers With 8 Cm Thick, The Filling Of The Pits And Trenches By Changing The Ground To The Distance From The Ground To 5 M, Power Of Bulldozers: 96 (130) Kw A.G.), Group 2 Group (Quality Back Casting), Drilling Of The Ground To The Distance From 10 M, Bulldozers Power: 96 (130) Kw (A.G.), Group 2 Group (Construction Site Cleaning), Group Of Group, With A Group Without Fastening In The Trenches Of The Depth Of 2 M, The Capacity Of The Clique Was Thrown Away By The Opposite Challenge Or Reflect With 0.65 (0.5-1) M3, Group Of Group: 2 (Under Rigeline), Mouse-Shopping Car Kamaz 66115, 2011 15T Transportation Distance-5 Km. 1St-Grade Load, Construction Waste Loaded With Excavator With 03 M3 Of The Capacity Of The Chain: Download, Softening Rocky Soils With A Hydrocket In Excavator Database, Group 6 (Demolition Of Existing D / Concrete Bridge), Construction Of Steel Railings Welded On Bridges And Road Transmitters (Demolition), Tajii Sand-Gravel Mix, {Setting Up The Lounge And Smoothing Layers Of Grounds: Sand-Gravel (From A Mixture, Large Sand, Six Basic Bases Of The Foundation: Gravel (Under The Edge Of The Edge), To Add The Ground To The Norm 01-01-034-02 During The Change Of Each Other 5 M, Add Or Exit (1 Cm In Addition) When The Cover Is Changed 03 Cm 03 Cm, Horizontal Concrete Surface Adhesive Insulation: 2 Layers, With Roll Materials (In The Movement Part Of The Bridge)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.