GTR 97984048
Tenders Are Invited For Renovation Of Poviat Road No. 1821B Episode Stawiski - Croissants
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
97984048
Tendering Authority
Subscribe to view
Tender No
PZD.26.8.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Poviat Road No. 1821B Episode Stawiski - Croissants
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
30-06-2025
Closed
Work Detail
1. The Subject Of The Order Is The Renovation Of Poviat Road No. 1821B Episode Stawiski - Croissants With A Length Of 1.313 Km, In Particular: 1) Measuring Works. 2) Mechanical Grinding Of Rare Bushes And Lining. 3) Mechanical Cutting Of Roadsides 15 Cm Thick. 4) Earthworks: - Removal Of Fertile Soil - Humus, Making A Riverbed, Cleaning Ditches. 5) Profiling And Compaction Of The Substrate Made Mechanically In The Catholic -Terms Iiv Ground For The Structural Layers Of The Surface. 6) Supplementing Roadside Width 0.75 M From A Broken Aggregate Mixture. 7) Exits To Property And Intersections From A Broken Aggregate Mixture. 8) Mechanical Purification Of Non -Compressed And Bituminous Road Surfaces. 9) Spring Of Road Surface Asphalt. 10) 5 Cm Thick Asphalt Mineral And Bullshit Mixtures (Binding Layer) Alignment. 11) Surfaces Made Of Asphalt Mineral And Bitumic Mixtures With A Thickness Of 4 Cm (Abdominal Layer). 12) Replacement Of Concrete Posts For Road Signs Made Of Steel Pipes With Diam. 60 Mm. 13) Replacement Of Damaged Concrete Barriers To Steel Barriers At 2+481 Km To Km 2+547.14) Renovation Of The Culvert - Sealing Of The Culvert Pipe Vertebrae At 2+396 Km (Demolition Of Road Structure, Cleaning The Cruisle Pipes, Filling The Joints Between The Pcc Pcc Pcc Vertebrae, Laying Two Layers Of Roofing Felt - On The Cross - Natural Aggregate Approx. 45 Cm, Arrangement Of The Road Structure - A Foundation Made Of Broken Aggregate 22 Cm, Binding Layer 6 Cm, Abdominal Layer 4 Cm). 15) Setting/Replacement Of Barriers On Both Sides On 8+8 Pass With A Front Ending. 16) As -Built Inventory. 1.1. The Contractor Is Obliged During The Warranty Period At The Request Of The Ordering Party To Supplement The Unpaved Roadside From The Material Provided For In The Project Documentation Within The Time Limit Indicated By The Employer. 1.2. Waste During Work And Building Materials That Do Not Use Re -Use Are Obliged To Use The Works On His Own And At Its Own Expense. 1.3. The Detailed Scope Of Work Was Included In The Design Documentation Constituting Annex 3 To This Swz, Technical Specifications For The Execution And Acceptance Of Construction Works Constituting Annex 4 To Swz And The Draft Contract Constituting Annex 6 To Swz.2. In Addition, The Contractors Tasks Would Include Photore Notification Of The Indicated Section Of The Road And Introducing Them To The Road Book. The Employers Books Keep The Ediom Designers (According To Annex 10 To Swz) 3. Due To The Flat -Rate Remuneration, The Bill Of Quantities Is An Auxiliary For The Valuation Of The Subject Of The Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c611da7d-5403-4524-8c96-97b647a555af.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.