Architectural, Engineering And Surveying Services - Erlangen Lock - Make, Install And Operate Automated Tachymeter System. The Erlangen Lock Is Located On The Mdk At Km 41.050. Since The Inventory Lock Is Already Damaged, A Replacement Building Of The Lock Was Decided In 2008. The Replacement Building Is Built To The Inventory Lock At A Distance Of Approx. 57.10 M (Lock Distance). This Is Also Moved By Approx. 300 M In The Direction Of The Uw. The Location Of The Locks Can Be Seen In The Overview Plan. During The Entire Construction Period Of Approx. 8 Years, The Inventory Lock Must Remain Reliably In Operation. An Unscheduled Blocking Of The Inventory Lock Would Lead To Traffic Reversals, Since There Are No Bypasses On The Main-Donau Channel. In Order To Identify Early Deformations Of The Inventory Lock During The Construction Period, Automated Tachymeter Measurement Is Intended By Means Of Precision Stechymeter. The Performance Includes Preparation, Setting Up And Implementation Of The Automated Tachymer Measurement At The Erlangen Existing Lock. The Tender Includes Delivering, Setting Up And Assembly Of Measurement Technology (Tachymeter, Object Points, Etc.) And Carrying Out The Automated Tachymeter Measurement And Evaluation As Well As The Provision Of The Results Over An Online Portal For 8 Years At The Inventory Lock.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.