Railway-Track Maintenance Services-A Diagnosis Of The Railway With A Trip Laboratory For A Period Of Three Years. In Article 405, Paragraph 1, Art. The Railway Is Subject To Periodic Measurement In A Load (Minimum Within 6 Months On The Main And 12 Months On The Secondary Railway Lines). Diagnosis Includes: 1.Control Of The Geometric Parameters Of The Railway In A Busy State And Video Control Of The Technical Condition Of The Elements Of The Above Construction Of The Railway. The Activities Will Be Carried Out On A Schedule Prepared By The Contractor And Coordinated With The Iron Road And Facilities Division, According To The Annexes For The Respective Year And Have A Total Length Of The Measured Sections For The 3-Year Term Of The Contract 25 073.85 Km: Year: 3 725,717, Third Year: 3 725,717 Secondary Railway Lines (Km)-First Year: 851,110, Second Year: 851,110, Third Year: 851,110 Year: 55,406 Total For The Ivo Annual Measurement- First Year: 4 632,233, Second Year: 4 632,233 Third Year 725,717 Total For Both Measurements (Km) First Year: 8 357,950, Second Year: 8 357,950, Third Year: 8 357,950 2.Control Of The Gauge Through A Laser System For Measuring The Distance From The Axis Of The Railway. The Activities Will Be Carried Out On A Schedule Prepared By The Contractor And Coordinated With The Iron Road And Facilities Division, According To The Annexes For The Respective Year And Have A Total Length Of The Measured Sections For The 3-Year Term Of The Contract 13 730,48 Km. Year: 3 725,717, Third Year: 3 725,717 Secondary Railway Lines (Km)-First Year: 851,110, Second Year: 851,110, Third Year: 851,110 Total For 1St Annual Measurement:-4 5 576,827, Third Year: 4 576,827 Ii-Year Of Measurement: Not Envisaged. A Total Of Years (Km)-First Year: 4 576,827, Second Year: 4 576,827, Third Year: 4 576,827 3. George Inspection Of The Ballast Prism, The Protective Layer, The Embankments And The Ground Base. The Activities Will Be Carried Out On A Schedule Prepared By The Contractor And Agreed With The Iron Road And Facilities Division, According To The Annexes For The Respective Year And With A Total Length Of Inspection For The 3-Year Contract Period 300 Km, Incl. 100,000, Second Year: 100,000, Third Year: 100,000 In Connection With The Implementation Of Infrastructure Projects Funded By Eu Funds And National Funding, At