Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
24-06-2025
Work Detail
Tenders are invited for Corner Culvert with a 3.3m High Water Gate, a Single-Faced Culvert with a 7m Length and a Water Gate The Sewer has a 3.3mm Top Gateway Luke is Rounding the 1 Mm of 7m Long with a 1-Place Gate Luper Luises 1 Mm 11m Long has 1 Gate of 1 Regulation in the Village of Siaia, Kampong, Kampong, And Stung Village (As Specified in a Technical Drawing) as Well as Three Project Logo. Estimated cost: 300,965,500 Riel Release Date: 09 June 2025 Closing Date: 24 June 2025 Time to start receiving bids: Hour 08:30 Minute Time to stop accepting bids: Hour 08:40 Minute Bid opening time: Hour 08:40 Minute [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : http://bid.ncdd.gov.kh/#do=list_project1&province_id=15&ann_district_id=132&ann_commune_id=29402
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.