Tenders Are Invited For 2 Designing And Making A Second Creative Line For The Needs Of Kck With Delivery, Assembly And Launch Of The Device (Furnace) And Adaptation Of The Incineration Plant Building To The Assembly Requirements Together ...
Tenders Are Invited For 2 Designing And Making A Second Creative Line For The Needs Of Kck With Delivery, Assembly And Launch Of The Device (Furnace) And Adaptation Of The Incineration Plant Building To The Assembly Requirements Together ...
1. Orders: Design And Execution Of A Second Creative Line For The Needs Of Kck With Delivery, Assembly And Launch Of The Device (Furnace) And Adaptation Of The Incineration Plant To Assembly Requirements Together With The Integration Of Monitoring Systems And Supporting Both Lines In The Design Build System - Procedure 22. Pfu Complete Design Documentation Necessary To Launch A Second Creative Line, Including The Selection Of The Appropriate Furnace And The Integration Of Monitoring Systems And Serving Both Lines. As Part Of This Stage, The Contractor Will Provide An Opinion On The Ceilings Load Capacity, Draw Up A Construction Project, Executive Design, Information On Safety And Health Protection, Hereinafter Referred To As Bioz, Works Of Works, Investor Cost Estimates, Technical Specifications Of The Execution And Acceptance Of Construction Works, Hereinafter Referred To As Stwiorb. The Contractor Is Also Obliged To Obtain The Required Opinions, Maps, Measurements, Allowed, Certificates, Permits - If They Are Required At The Stage Of Preparing The Project - And To Submit Works Or Obtain A Decision On A Building Permit - If Required - And Transfer To The Contracting Authority Project Throughout The Entire Period Of Implementation Of Works, In Particular: Confirmation Of The Compliance Of The Implementation Of Construction Works With The Project Documentation, Active Participation In Committees, Technical Meetings, Acceptance Of Works And Every Call Of The Ordering Party With A Frequency Adapted To The Real Needs And Problems Reported By The Contracting Authority. Agreements Regarding The Possibility Of Introducing Replacement Solutions In Relation To The Project Provided For In The Project Documentation In The Event Of An Error Or Inaccuracy In The Documentation Or After The Problem Of The Problem By A Representative Of Either Party (Construction Manager, Works Manager, Investor Supervision Inspector, Participant In The Meeting) Together With The Cost Calculation Of This Solution And The Presentation For The Contracting Authority. 3) It Includes The Implementation Of The Second Creative Line According To The Draft Documentation Referred To In Point 1), Accepted By The Ordering Party, In Accordance With The Law, In Particular The Construction Law, Executive Provisions And Other Related Provisions, Appropriate For The Implementation Of The Subject Of The Contract, Applicable Standards, Technical Conditions, Technical Knowledge Principles, Instructions Of The Ordering Party, Inspector Of Construction Supervision, Designer Performing Author As -Built Documentation Together With The Transfer To The Contracting Authority Of Copyright And Obtaining A Permit For Use, If Required. 3. Cpv Dictionary: 45215300-0 Construction Works In The Field Of Crematoria 4. Detailed Information On The Description Of The Subject Of The Contract And Its Scope And The Method Of Implementation Includes This Specification Of The Terms Of The Contract Together With The Annexe
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.